Assembly Manual
Set gable door wall on oor and secure using one 2" screw (Fig A).
1
ENSURE TOP WALL FRAMES ARE FLUSH.
2
43
3" (7,6 cm)
GABLE DOOR WALL
2" (5,1 cm)
x8
x2
x28
1-1/2" (3,8 cm)
PARTS REQUIRED:
3" (7,6 cm)
x4
2" (5,1 cm)
x4
BEGIN
Stand gable door wall on oor.
It is important to secure the front wall in the following order:
2"
(5,1 cm)
Screw
2"
(5,1 cm)
Screw
Flush
Flush
Flush
Flush
Move to the bottom of gable end wall and secure bottom of wall using one 2" screw
into front and back wall bottom plates (Fig B).
ENSURE WALL PANELS ARE FLUSH BEFORE SECURING.
Fig. B
2" (5,1 cm)
Screw
Fig. A
2" (5,1 cm)
Screw
Flush










