Assembly Manual
59
PARTS REQUIRED:
GABLE TRIM
Flush
Flush
Flush
Flush
2" (7,6 cm)
Finish Nails
2" (7,6 cm)
Finish Nails
RIGHT FASCIA
FASCIA
LEFT FASCIA
x4
3/8 x 4-3/4 x 54-5/8" (1 x 12,1 x 138,7 cm)
x2
3/8 x 10 x 17"
(1 x 25,4 x 43,2 cm)
Keystone
Flush
Flush
18"
(46 cm)
Approximately
You have nished installing your gable fascia and keystone.
FINISH
BEGIN
1
Secure with 2" nish nails into gable unit in pattern shown.
Secure with 2" nish nails into gable unit and spaced evenly (approximately 18" (46 cm).
Secure with 2" nish nails into gable unit and spaced evenly (approximately 18" (20,3 cm).
Repeat Steps 1 - 3 for opposite side.
Line up (10" x 17") Keystone ush to gable unit peak and ush with roof sheathing (Fig. A).
Place fascia 4-3/4" x 54-5/8" ush to Keystone and ush with roof sheathing (Fig. B).
Place LEFT fascia ush to Keystone and ush with roof sheathing (Fig. B).
4
2
3
2" (5,1 cm)
Finish Nail
Flush
Fig. B
End
View
x48
2" (5,1 cm)
Fig. A
Flush
Flush
Keystone










