Assembly Manual
62
EAVE SIDE FASCIA
x36
2" (5,1 cm)
Repeat Steps 1 - 2 to attach eave nailer and sof t boards on the opposite side.
1
BEGIN
3
2
You have nished installing your eave side fascia.
FINISH
PARTS REQUIRED:
Primed Side Out
2" (5,1 cm) Finish Nails
Flush with
roof panel
Fig.A
Flush
x2
3/8 x 4-3/4 x 77-1/4" (1 x 12,1 x 196,2 cm)
x2
3/8 x 4-3/4 x 96" (1 x 12,1 x 243,8 cm)
Place 77-1/4" sof t board primed side down, ush to gable trim unit and roof sheathing (Fig A).
Secure using 2" nish nails, two in each rafter and two into face of AO as shown.
Place 96" sof t board primed side down,
ush to gable trim unit and roof sheathing (Fig A). Secure
using 2" nish nails, two in each rafter and two into face of AO as shown.
4-3/4" x 77-1/4"
4-3/4" x 96"