Assembly Manual

77
FINISH
PARTS REQUIRED:
5
6
7
Locate DEA and AUA centered and  ush to shutters as shown.
Attach using 2"  nish nails. Nail into framing.
Locate JTA centered over trim.
Attach using one 2"  nish nail as shown.
Nail into framing.
Place NRA keystone centered over JTA.
Attach using four 2"  nish nails as shown. Nail into framing.
You have  nished installing your shutters and window trim.
x17
2" (5 cm)
WINDOW TRIM (cont.)
AUA
x1
2 x 2-1/2 x 53" (5,1 x 6,3 x 134,6 cm)
DEA
x1
2 x 3-1/2 x 55" (5,1 x 8,9 x 139,7 cm)
CENTER
CENTER
CENTER
CENTER
CENTER
CENTER
FlushFlush
FlushFlush
DEA
AUA
JTA
NRA
2" (5,1 cm)
Finish Nails
into wall frame
2" (5,1 cm)
Finish Nails
into wall frame
2" (5,1 cm)
Finish Nails
into wall frame
x1
19/32 x 6-7/16 x 5-1/2" (1,5 x 17,5 x 14 cm)
NRA
x1
19/32 x 6-7/16 x 2" (1,5 x 16,4 x 5,1 cm)
JTA
Mark
Mark