Assembly Manual
Set gable end wall on oor and secure top of wall
using one 2" screw into top plate (FigA).
1
40
GABLE END WALL INSTALLATION
3" (7,6 cm)
2" (5,1 cm)
x22
2" (5,1 cm)
x2
x1
x14
1-1/2" (3,8 cm)
PARTSREQUIRED:
3" (7,6 cm)
x10
It is important to secure the gable end wall
in the following order:
ENSURETOPOFWALLFRAMESAREFLUSH.
3
2
Nail lower edge of panels to oor using 2" nails 6" apart.
Angle nail to hit oor frame (Fig.B).
ENSUREGABLEANDBACKWALLPANELS
AREFLUSHBEFORESECURING.
You have nished standing your gable end wall
FINISH
8
Secure gable wall to oor using 3" nails (Fig.C).
Remove temporary support OO.
Nail gable wall panel to back wall stud
using 1-1/2" nails 6" apart (Fig.C).
4
5
7
6
6"
(15,2 cm)
Flush
Fig.A
Fig.B
2"(5,1cm)
Nail
Angle nail to hit
oorframe.
Secure gable wall top frame 2 x 4 using one 3" screw
toe-screwed into eave wall frame at an angle as
shown (Fig.D).
6"
(15,2 cm)
3"(7,6cm)
Nails
1-1/2"
(3,8cm)
Nails
Fig.D
3"(7,6cm)
Screw
BEGIN
Stand gable end wall on oor.
2"(3,8cm)
Screw
2"
(5,1cm)
Screw
Fig.C
Move to the bottom of gable end wall and
secure bottom of wall using one 2" screw into
eave wall bottom plate (FigA).
Flush
STEP 1 FIRST
SCREW
2"(5,1cm)
Nails
STEP 3
STEP 2 SECOND
SCREW
2"
(5,1cm)
Screw
Flush










