Assembly Manual

Secure top of wall using one 2" screw into top plate (FigA).
41
PARTSREQUIRED:
3" (7,6 cm)
x3
2" (5,1 cm)
x25
FRONT WALL INSTALLATION
2" (5,1 cm)
x2
x14
1-1/2" (3,8 cm)
DOOR
DOOR
Fig.A
Flush
STEP 3 FIRST
SCREW
BEGIN
Stand front wall on oor.
Center front wall assembly on the 144" (365,8 cm) oor dimension.
Use OO as a temporary brace.
Secure with two 3" screws.
2
1
OO
Panel
Flush
144"
(365,8 cm)
Nail gable wall panel to front wall stud using
1-1/2" nails 6" apart (Fig.B).
5
6
3
ENSUREGABLEANDFRONTWALL
PANELSAREFLUSHBEFORESECURING.
6" (15,2 cm)
Fig.B
1-1/2"
(3,8cm)
Nails
Fig.C
BESURETOPOFWALLFRAMESAREFLUSH.
2"
(7,6cm)
Screw
2"(5,1cm)
Screw
OO
x1
1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
4
Move to the bottom of gable end wall and
secure bottom of wall using one 2" screw into
front wall bottom plate (FigA).
Flush
3"(7,6cm)
Screw
3"(7,6cm)
Screw
Secure gable wall top frame 2 x 4 using one 3" screw
toe-screwed into eave wall frame at an angle as
shown (Fig.C).
STEP 4 SECOND
SCREW
3"(7,6cm)
Screws