Assembly Manual
Set second gable wall on oor and secure using one 2" screw on each side (FigA).
1
ENSURETOPWALLFRAMESAREFLUSH.
2
43
3" (7,6 cm)
GABLE END WALL INSTALLATION
2" (5,1 cm)
x40
x2
x28
1-1/2" (3,8 cm)
PARTSREQUIRED:
3" (7,6 cm)
x6
2" (5,1 cm)
x4
BEGIN
RemoveTemporarySupports and stand gable end wall on oor.
It is important to secure the gable end wall in the following order:
Fig.B
2"
(5,1cm)
Screw
2"
(5,1cm)
Screw
Flush
Flush
Fig.A
2"(5,1cm)
Screw
Flush
Flush
Flush
Move to the bottom of gable end wall and secure bottom of wall using one 2" screw into
front wall bottom plate (FigB).
ENSUREWALLPANELSAREFLUSHBEFORESECURING.
2"(5,1cm)
Screw










