Assembly Manual
x16
1-1/2" (3,8 cm)
x2
2 x 4 x 24" (5,1 x 10,2 x 61 cm)
RL
TEMPORARYSUPPORT
x2
2 x 4 x 75-1/4" (5,1 x 10,2 x 191,1 cm)
ECA
45
GABLE PANELS
PARTSREQUIRED:
x2 x2 x2
Primed
side up
Primed
side up
Primed
side up
1-3/4"
(4,5 cm)
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
1-1/2"
(3,8cm)
Nails
RL(onat)
RL
RL
RL
ECA
ECA
You will build TWO assemblies. Orient RL and ECA on at as shown.
Place LEFT front gable panel as shown and secure using 1-1/2" nails.
2
1
BEGIN
3
4
5
Place second RLas shown. Place MIDDLE front gable panel ush to installed left panel. Ensure panels are ush.
Secure panel to installed RL using 1-1/2" nails. Place second RL as shown under MIDDLE panel and secure using
using 1-1/2" nails.
Place RIGHT front gable panel ush to installed middle panel. Ensure panels are ush.
Secure to RL using 1-1/2" nails.
Repeat Steps 1-4 to build second gable panel.
You have nished assembling your gable panels.
FINISH
6
Flush
Flush
Maintain
Flush
Maintain
Flush
1-3/4"
(4,5 cm)
1-1/2"
(3,8cm)
Nails
1-1/2"(3,8cm)
Nails