Assembly Manual

52
4-5/16"
(11 cm)
PARTSREQUIRED:
DORMER
3" (7,6 cm)
x8
Secure truss with 3" screws in top plate and 1-1/2" screws
speced evenly through OSB side panels as shown.
Secure front dormer panel with 2" nails 6" apart along edge.
Repeat Steps 8-9 to install opposite RIGHTpre-assembled truss.
Place LEFTpre-assembled truss (gusset facing in) resting on top of dormer front frame and back wall top
plate. Ensure dormer truss is ush along edge of panel and ush at peak of installed truss (Fig.F,Fig.G).
Place 20"x72"OSB panel against front wall frame and resting on top of door panels.
Ensure front dormer panel is ush with side panels along edge (FigE).
9
7
10
8
6
x12
1-1/2" (3,8 cm)
1-1/2"(3,8cm)
Nails
1-1/2"(3,8cm)
Nails spaced evenly
3"(7,6cm)
Screws
3"(7,6cm)
Screws
x1
OSBPanel
20 x 72" (50,8 x 182,9 cm)
2" (5,1 cm)
x32
Fig.F
Flush
LEFTTruss
x1gusset
RIGHTTruss
x1gusset
Flush
2"(5,1cm)
Nails
Flush
Flush
Flush
6"
(15,2 cm)
Flush
Fig.E
x1
Pre-assembled dormer
truss with 1 gusset
(forLEFTside)
x1
Pre-assembled dormer
truss with 1 gusset
(forRIGHTside)
FrontDormerPanel
Flush
Peaks
Flush
Fig.G
INSTALLOSBWIDESIDE
TOWARDBOTTOM
7/16 x 7-7/8 x 23-7/8"
(1,1 x 20,0 x 60,6 cm)
x1
TEMPORARY
OSBSPACER
7/16"GAP
H INT:
Use 7-7/8 x23-7/8"
OSB as a spacer. (Do not
nail or screw into spacer.)