Assembly Manual
61
#15ROOFINGFELT
(x40)1"GALVANIZEDROOFINGNAILS
PARTSREQUIRED:
DORMER FELT / FLASHING
1
BEGIN
ReadroonginstructionsbeginningatPage93forroongfeltandshingleinstallation.
Followinsructionsbelowfordormerroongfeltandashinginstallation.
Install roong felt around dormer prior to ashing. Overlap felt layers by 3". Wrap corners with felt before
installing larger pieces. Secure felt with 1" roong nails as shown. Nail only into dormer OSB panels with
framing behind panel. Trim felt around OSB window openings.
Flash the front of dormer using (3) 4" x 32" ash cards. Overlap ends of ashing 2". Extend ashing 3" past
corner of dormer. Trim ashing corner ends as shown (Fig.A). Bend tab around corner and secure ashing with
1" roong nails. At one end ashing will have excess metal trimmed off length.
Repeat Steps1-2 for opposite side.
OVERLAPFELT3"
WrapcornersFIRST
2"Overlap
2
3
3"
(7,6 cm)
3"
(7,6 cm)
2"
(5,1 cm)
2"
(5,1 cm)
Fig.A
3"
(7,6 cm)
(x3)4"x32"Aluminum
FlashingCards
2"
2"
Pre-Bend90
o
2"
2"
Pre-Bend
Flashing 90
o










