62
(x40)1"GALVANIZED
ROOFINGNAILS
PARTSREQUIRED:
DORMER FLASHING / SHINGLES
Trim, bend and nail a 5" x 7" ashing at the dormer corner (Fig.B). Secure ashing with 1" nails.
Lay rst row of shingles on top of ashing (Fig.C). Secure shingles with 1" roong nails. Lay second row of
shingles up to side of dormer (Fig.C). Secure with 1" roong nails. Bend, place and nail a 5" x 7" ashing up the
dormer wall and on top of shingle. Overlap rst 5" x 7" ashing by 1-1/2". Secure with 1" roong nails.
Do not nail into dormer wall.
Lay next shingle on top of 5" x 7" ashing. Secure shingle with 1" nails. Bend and place next 5" x 7" ashing up
the dormer wall and on top of shingle. Overlap ashing by 1-1/2". Secure ashing with 1" roong nails.
Keep alternating and stepping ashing and shingles as in Step 5 until you have reached the roof peak (Fig.D).
You will have to trim ashing when you work near top of dormer.
Repeat Steps 4-6 for opposite side.
You have nished installing your dormer ashing. Proceed to complete your dormer.
FINISH
8
4
5
6
7
Fig.D
TRIMFlashingattop
Fig.B Fig.C
1-1/2"OVERLAP
1-1/2"OVERLAP
(x30)5"x7"Aluminum
FlashingCards
2-1/2"
Pre-Bend90
o
2-1/2"