Assembly Manual
62
(x40)1"GALVANIZED
ROOFINGNAILS
PARTSREQUIRED:
DORMER FLASHING / SHINGLES
Trim, bend and nail a 5" x 7" ashing at the dormer corner (Fig.B). Secure ashing with 1" nails.
Lay rst row of shingles on top of ashing (Fig.C). Secure shingles with 1" roong nails. Lay second row of
shingles up to side of dormer (Fig.C). Secure with 1" roong nails. Bend, place and nail a 5" x 7" ashing up the
dormer wall and on top of shingle. Overlap rst 5" x 7" ashing by 1-1/2". Secure with 1" roong nails.
Do not nail into dormer wall.
Lay next shingle on top of 5" x 7" ashing. Secure shingle with 1" nails. Bend and place next 5" x 7" ashing up
the dormer wall and on top of shingle. Overlap ashing by 1-1/2". Secure ashing with 1" roong nails.
Keep alternating and stepping ashing and shingles as in Step 5 until you have reached the roof peak (Fig.D).
You will have to trim ashing when you work near top of dormer.
Repeat Steps 4-6 for opposite side.
You have nished installing your dormer ashing. Proceed to complete your dormer.
FINISH
8
4
5
6
7
Fig.D
TRIMFlashingattop
Fig.B Fig.C
1-1/2"OVERLAP
1-1/2"OVERLAP
(x30)5"x7"Aluminum
FlashingCards
2-1/2"
Pre-Bend90
o
2-1/2"