Assembly Manual

73
PARTSREQUIRED:
GABLE END SOFFITS
Position right 73-5/16" overhang board PrimedSideDown ush to front wall (FigA)
and gable panel seam (FigB). Secure using twelve 2" nish nails.
Position left 73-5/16" overhang board PrimedSideDown ush to front wall (FigC),
gable end and right overhang board (Fig.D). Secure using twelve 2" nish nails.
Repeat Steps1-2 to attach soft boards on the opposite side.
Ensuresoftboardsarelined-upatseam(Fig.B)andatpeak(Fig.D).
x4
3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm)
x72
2" (5,1 cm)
2
3
1
BEGIN
You have nished installing your soft panels.
FINISH
4
PrimedSideDown
Flushtowall.
Fig.C
Line-up
atpeak.
Fig.D
8"
(20,3 cm)
PrimedSideDown
Flushtowall.
Fig.A
Fig.B
8"
(20,3 cm)
2"(5,1cm)Nails
x12perside
Line-upat
centerseam.
Flush
Flush