Assembly Manual

75
GABLE FASCIA
x40
2" (5,1 cm)
2
Position fascia with primed side out and ush to peak and roof panels as shown (Fig.A,FigB).
Secure using 2" nish nails spaced evenly as shown.
Repeat Step 1 on opposite side with other fascia.
Repeat Steps1-2 to attach fascia boards on the other gable end.
3
You have nished installing your gable fascia.
FINISH
4
1
BEGIN
PARTSREQUIRED:
x2
3/8 x 4-3/4 x 75-7/8" (1 x 12,1 x 192,7 cm)
x2
3/8 x 4-3/4 x 75-7/8" (1 x 12,1 x 192,7 cm)
Primed Side Out
Fig.A
Fig.B
Flush
Flushatpeak.
SPACEDEVENLY
FlushwithtopofOSBroofpanels
2"(5,1cm)FinishNails
x10perFascia
Hint:Pre-setnailsinfascia
beforenalinstallation.
PaintedRed
PaintedGreen