Assembly Manual
85
Flush at
SEAM
PARTSREQUIRED:
LOFT
x1
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x14
3" (7,6 cm)
2 x 4 x 24" (5,1 x 10,2 x 61 cm)
RL
x1
2 x 4 x 119-7/8" (5,1 x 10,2 x 304,5 cm)
x1
Pre-AssembledLoftJoist
Locate TP and RL ush to bottom of top plate and aligned at seam. Secure with 3" (7,6 cm) nails at wall
studs and seam.
5
7/16" (11 mm) Drill Bit
x2
x4
x2
3/8" x5-1/2" (1 cm x 14 cm)
3/8" (1 cm)
3/8" (1 cm)
HexBolt
FlatWasher
LockNut
(NOTACTUALSIZE)
6
7
Clamp or hold Pre-AssembledLoftJoist in place ush against window crippler and back wall stud.
Ensure Pre-AssembledLoftJoistis ush beneath top plates.
Drill through wall stud with 7/16" drill bit using hole in Pre-AssembledLoftJoist as a guide.
Line up holes of Pre-AssembledLoftJoist with holes in crippler and stud.
Secure joist with hex bolts, at washers and lock nuts at both sides (Fig.B).
Tighten lock nuts securely.
GABLE
WALL
3"(7,6cm)
Nails
TP RL
Flush
Flush
Fig.B
Flush
Flush
JOISTTOFRONTOF
WINDOWCRIPPLER
JOISTTOFRONTOFSTUD










