Assembly Manual
93
FINISH
10
7
8
9
6
For Step 7, have a second person hold
and press inward from outside shed while
screws are installed.
From INSIDE of the shed, use three 3/4"
screws to secure the shutter indicated at "X".
Place MDA ush up to bottom of shutters.
Line-up MDA ush with shutter slats (Fig.C).
Attach using 2" nish nails.
Nail into window frame and studs behind.
You have nished installing your front windows and shutters.
Repeat Steps4-7 to install shutters for second window.
Fig.B
Fig.C
2"FinishNails
into wall frame
3/4"Screws
from inside
Flush
Flush
LEVEL
Line-up shutter slat ush with end corner of QKA
as shown (Fig.B).
Use a level to ensure shutter is level.
Attach using 2" nish nails at locations shown.
Nail into window frame and studs behind.
PUSHINTOSTEADYPANEL
QKA
MDA
2"Finish
Nails
Flush
Flush










