User Manual Part 1
    Link CX-24 User’s Manual 
Version 1.0  Page 35  February 2004 
incursion and damage. For all exposed connectors, including those between an external antenna and the 
Link CX-24, perform the following: 
39  Wrap each connector with vinyl or plastic electrical tape. 
40  Wrap the vinyl or plastic electrical tape with butyl rubber amalgamating tape to prevent moisture from 
permeating the connector. 
41  Wrap the butyl rubber amalgamating tape with vinyl or plastic electrical tape. 
Continue with Section 2.14 to fine tune the antenna’s azimuth and elevation. 
2.14 Aligning the Antenna 
This section includes steps used to fine-tune the antenna alignment using RSSI as measured using a 
voltmeter. This part of the installation procedure is most easily accomplished with installers at each end of 
the radio link who are in communication with one another. 
Notes:  i) Failure to follow this antenna alignment procedure may damage your equipment and may 
render the radio unusable. Read through the entire procedure before attempting adjustment. 
Contact YDI with any questions. 
  ii) When you apply power to the Link CX-24, it starts transmitting. Do not stand within 2 m (79 
in.) of the front of the antenna during Link CX-24 operation to avoid harmful RF radiation. 
2.14.1 Adjustable Azimuth/Elevation Mount 
Perform Steps 42 through 49 on the local radio. Then, repeat these steps for the remote radio. See 
Figure 2.17. 
42  Remove the cap from the BNC connector of the remote radio. Attach the hand-held voltmeter and 
BNC test lead to the test point. 
43  Fine Azimuth Alignment -- Rotate the Link CX-24 mounting bracket on the pole until the proper 
azimuth alignment is achieved. It is advised that, in order to ensure the true maximum, you should 
adjust through the maximum RSSI reading until the reading clearly drops and continues to drop to 
lower level side-lobes. Adjust back until the maximum is again attained. Expected voltage is more 
than +1 VDC. The adjustment should be slowly tuned through the peak, and reset at the absolute 
maximum before tightening. 
44  Fine Elevation Alignment -- Rotate the Link CX-24 mounting bracket until the proper elevation 
alignment is achieved. It is advised that, in order to ensure the true maximum, you should adjust 
through the maximum RSSI reading until the reading clearly drops and continues to drop to lower 
level side-lobes. Adjust back until the maximum is again attained. Expected voltage is more than +1 
VDC. The adjustment should be slowly tuned through the peak, and reset at the absolute maximum 
before tightening the bolts. 
45  Tighten the two Azimuth adjustment bolts while observing the RSSI reading to ensure the azimuth 
alignment does not change while tightening. Torque the two M8 galvanized hex bolts to 24 N-m 
(17.7 lb-ft). 
46  Tighten the Elevation adjustment bolt while observing the RSSI reading to ensure the elevation 
alignment does not change while tightening. Torque the M8 galvanized hex bolt to 24 N-m (17.7 lb-ft). 
CAUTION:  It is possible to obtain a false peak RSSI reading from the signal of a side-lobe. Up to three 
different side-lobes on either side of the main lobe may give false peak alignment readings. 










