The Link CX-24 is now mounted and aligned. Continue with Section 2.15 for acceptance tests. 
2.15 Acceptance Testing 
This section describes the tests used to verify that the Link CX-24 data input circuitry, near-end Link CX-
24 radio, radio link, and far-end Link CX-24 radio are installed properly and operating correctly. 
50  Verify that the physical installation is correct. Use Table 2.5 to sign off the individual checks. 
Table 2.5 – Physical Installation Checklist 
Checklist Item  Verified Inspector  Date 
Is the mounting pipe securely connected to the 
mounting structure? 
Is the Link CX-24 securely connected to the 
mounting pipe? 
Is the lightning protection above the Link CX-24 
properly grounded? 
Is the Link CX-24 properly grounded?       
Is the lightning arrestor at the entry to the 
equipment enclosure properly grounded? 
Is all cabling to the Link CX-24 properly routed 
(no sharp bends and properly attached)? 
Are all exposed connectors properly sealed 
against moisture? 
Are all unused connectors capped off or 
otherwise sealed against moisture? 
Is the antenna polarization correct (as indicated 
on the back of the unit)? 
51  Verify that the electrical connections are correct. Use Table 2.6 to sign off the individual checks. 