Operating Instructions and Installation Instructions

Edition: 02 / 2015 Page 11 / 56
VARMAX TWIN - Installation, Use and Maintenance
4. INSTALLATION
4.6. Positioning the air lters and the ltering layers
!
IMPORTANT: The air lters provided with the generators MUST be installed.
The air lters must be installed before the gas lines are connected.
Refer to the VARMAX generator's installation, usage and maintenance
manual, paragraph "4-1 Positioning the air lter and the layer").
4.7. Installing the boiler
The VARMAX TWIN boilers must not be installed on an ammable surface
(wooden oor, plastic oor covering, etc.).
Recommended distances relative to walls and ceiling:
Suf cient clearances must be provided to permit easy maintenance
operations on the boilers.
The minimum values (in mm) are indicated in gure 2 and in the table below.
A* B* C H
MODELS
550 450 600 263
640 450 600 263
780 450 700 427
900 450 700 427
The greyed out zone above the boiler must remain free of any obstacles
to enable the burner to be inspected and cleaned.
These values cannot be substituted for the speci c regulatory
requirements.
gure 2 - Peripheral clearance
H
A
B
C
450
±10