Operating Instructions and Installation Instructions

Edition: 02 / 2015 Page 13 / 56
VARMAX TWIN - Installation, Use and Maintenance
4 Te on plates are provided to facilitate the introduction of the 2 generators
in relation to each other:
Put one plate under each of the 4 feet of the generator to be moved,
Position the generator,
• Remove the Te on plates.
gure 5 - cable trays
Te on plates (x4)
4.8. Installing the LPB bus cable trays
Position the 2 trays for the LPB bus cable on the rear of the 2 generators and
secure them using the 4 self-tapping screws provided.
gure 4 - Te on plate positioning
}
4 self-tapping screws provided
The roof of each generator must be drilled (Ø 4 bit); to do so, use the trays
as scale.