Specifications
Table Of Contents
- Form 150.72-NM1 (908)
- GENERAL SAFETY GUIDELINES
- CHANGEABILITY OF THIS DOCUMENT
- TABLE OF CONTENTS
- LIST OF FIGURES
- LIST OF TABLES
- SECTION 1 – GENERAL CHILLER INFORMATION & SAFETY
- SECTION 2 – PRODUCT DESCRIPTION
- INTRODUCTION
- GENERAL SYSTEM DESCRIPTION
- HIGH AMBIENT KIT
- BUILDING AUTOMATION SYSTEM INTERFACE
- MILLENIUM CONTROL CENTER
- POWER PANEL
- ACCESSORIES AND OPTIONS
- UNIT COMPONENTS
- CONTROL / POWER PANEL COMPONENTS
- PRODUCT IDENTIFICATION NUMBER (PIN)
- BASIC UNIT NOMENCLATURE
- REFRIGERANT FLOW DIAGRAM
- PROCESS AND INSTRUMENTATION DIAGRAM
- SECTION 3 – HANDLING AND STORAGE
- SECTION 4 – INSTALLATION
- INSTALLATION CHECKLIST
- HANDLING
- INSPECTION
- LOCATION AND CLEARANCES
- SPRING ISOLATORS (OPTIONAL)
- COMPRESSOR MOUNTING
- REMOTE COOLER OPTION
- CHILLED LIQUID PIPING
- PIPEWORK ARRANGEMENT
- DUCT WORK CONNECTION
- WIRING
- COMPRESSOR HEATERS
- RELIEF VALVES
- HIGH PRESSURE CUTOUT
- SINGLE-POINT SUPPLY CONNECTION – TERMINAL BLOCK, NON-FUSED DISCONNECT SWITCH OR CIRCUIT BREAKER
- USER CONTROL WIRING INPUTS
- USER CONTROL WIRING OUTPUTS
- SECTION 5 – TECHNICAL DATA
- OPERATIONAL LIMITATIONS (ENGLISH)
- HEAT EXCHANGER FLOW, GPM
- PHYSICAL DATA (ENGLISH)
- ELECTRICAL DATA
- ELECTRICAL NOTES
- ELECTRICAL DATA W/O PUMPS
- ELECTRICAL DATA W/ PUMPS
- ELECTRICAL NOTES AND LEGEND
- WIRING DIAGRAMS
- DIMENSIONS (ENGLISH)
- TECHNICAL DATA – CLEARANCES
- WEIGHT DISTRIBUTION AND ISOLATOR MOUNTING POSITIONS
- ISOLATOR INFORMATION FOR UNITS SHIPPED ON OR AFTER JUNE 15, 2008
- ISOLATOR INFORMATION FOR UNITS SHIPPED BEFORE JUNE 15, 2008
- SLRS Seismic Isolator Specifications
- SLRS Seismic Isolator Installation and Adjustment
- One Inch Deflection Spring Isolator Cross-reference
- Installation of 1” Deflection Mounts
- Neoprene Isolator Cross-reference
- Two Inch Deflection, Seismic Spring IsolatorCross-reference - SLRS
- SLRS Seismic Isolator Installation and Adjustment
- SECTION 6 – COMMISSIONING
- SECTION 7 – UNIT CONTROLS
- SECTION 8 – UNIT OPERATION
- CAPACITY CONTROL
- SUCTION PRESSURE LIMIT CONTROLS
- DISCHARGE PRESSURE LIMIT CONTROLS
- LEAVING CHILLED LIQUID CONTROL
- LEAVING CHILLED LIQUID CONTROLOVERRIDE TO REDUCE CYCLING
- LEAVING CHILLED LIQUID SYSTEM LEAD/LAG AND COMPRESSOR SEQUENCING
- RETURN CHILLED LIQUID CONTROL
- RETURN CHILLLED LIQUID SYSTEM LEAD/LAG AND COMPRESSOR SEQUENCING
- ANTI-RECYCLE TIMER
- ANTI-COINCIDENCE TIMER
- EVAPORATOR PUMP CONTROL & YORK HYDRO KIT PUMP CONTROL
- EVAPORATOR HEATER CONTROL
- PUMPDOWN CONTROL
- STANDARD CONDENSER FAN CONTROL
- LOAD LIMITING
- COMPRESSOR RUN STATUS
- ALARM STATUS
- REMOTE BAS/EMS TEMPERATURE RESET USINGA VOLTAGE OR CURRENT SIGNAL
- SECTION 9 – SERVICE AND TROUBLESHOOTING
- SECTION 10 – MAINTENANCE
![](/manual/york/millennium-y14/specifications-english/images/img-23.png)
JOHNSON CONTROLS
32
FORM 150.72-NM1 (908)
Handling and Storage
SECTION 3 – HANDLING AND STORAGE
DELIVERY AND STORAGE
To ensure consistent quality and maximum reliability,
all units are tested and inspected before leaving the
factory. Units are shipped completely assembled and
containing refrigerant under pressure. Units are shipped
without export crating unless crating has been specied
on the Sales Order.
If the unit is to be put into storage, prior to installation,
the following precautions should be observed:
• The chiller must be “blocked” so that the base is
not permitted to sag or bow.
• Ensure that all openings, such as water connec-
tions, are securely capped.
• Do not store where exposed to ambient air tem-
peratures exceeding 110 °F (43 °C).
• The condensers should be covered to protect
the ns from potential damage and corrosion,
particularly where building work is in progress.
• The unit should be stored in a location where
there is minimal activity in order to limit the risk
of accidental physical damage.
• To prevent inadvertent operation of the pres-
sure relief devices the unit must not be steam
cleaned.
• It is recommended that the unit is periodically
inspected during storage.
INSPECTION
Remove any transit packing and inspect the unit to
ensure that all components have been delivered and that
no damage has occurred during transit. If any damage
is evident, it should be noted on the carrier’s freight bill
and a claim entered in accordance with the instructions
given on the advice note.
Major damage must be reported immediately to your
local YORK representative.
MOVING THE CHILLER
Prior to moving the unit, ensure that the installation site
is suitable for installing the unit and is easily capable
of supporting the weight of the unit and all associated
services.
The units are designed to be lifted using cables. A
spreader bar or frame should be used in order to prevent
damage to the unit from the lifting chains.
Units are provided with lifting eyes in the sides of the
base frame, which can be attached to directly using
shackles or safety hooks.
Care should be taken to avoid damaging the condenser
cooling ns when moving the unit.
Lifting Weights
For details of weights and weight distribution, refer to
the data shipped in the chiller information packet and
unit nameplate.