User`s manual

49
OPERATIONS TO BE PERFORMED
The long-life, economical use and efficiency of lifting equipment depend on the scheduled maintenance given in this table.
These are general maintenance procedures and should be considered the minimum requirement.
Naturally, reference to 60 months of scheduled maintenance doesnt guarantee that the machine will work perfectly, in
addiction to maintenance other factors are important: appropriate use, the intensity of working cycle, and environmental
conditions.
We strongly advise compliance with the maintenance intervals given below, checks concerning parts subject to wear tear as
well as the consumption of lubricant.
IMPORTANT
Intervals between servicing should decrease when hoists and cranes are operating in extreme environmental conditions, or
have a high Duty Rating, (eg. Monthly instead of yearly checks).
EVERY COMPONENTS TO BE INSPECTED
REPLACEMEN
TS
VERIFICATIONS AND
ADJUSTMENTS
LUBRICATIONS
1 YEAR
(12
months)
BRAKES
Air Gap – Springs
Lining wear and tear
Cleaning
LIFTING CHAIN
Crushing, broken wires
Cleaning and greasing
CHAIN GUIDE
Sproket clearance and
wear and tear degree
PUSH BUTTON CONTROL PANEL
Broken push buttons
and blocked terminals
Cleaning
WHEELS OF THE MONORAIL
TROLLEY
Wear and tear degree
Toothing play
Pinion keying
Cleaning of sliding
surfaces and greasing of
the toothing
LIMIT SWITCH
Working order
Stop limits