Owner's manual
System 182 XT-4 Installation
3 - 19
ba76027e01 02/2012
Materials required 1 x SNCIQ or SNCIQ/UG connection cable (see
chapter 12 A
CCESSORIES AND OPTIONS)
Wire end sleeves for 0.75 mm2 wire cross-section with matching
crimping tool
1 x cable gland, matched to the cable diameter (see section 3.9 on
page 3-33).
Tools Cable stripping knife
Wire stripper
Phillips screwdriver
Small screwdriver.
Preparing the cable
ends
1 Cut off the cable to the required length.
2 Remove approx. 45 mm of cable insulation (in the case of the
SNCIQ/UG earth cable, remove both the inner and
outer
insulation).
3 Only for the SNCIQ/UG earth cable:
strip the outer insulation for a further 35 mm.
4 Shorten the exposed shielding braid up to the cable sheath.
5 Shorten the two fillers (plastic inlays) up to the cable sheath.
6 Bare the red and green wires and fit them with wire end
sleeves.
7 Fit the filler stranded wire with a wire end sleeve.