Install Instructions

Page 1 of 18
Z-VENT
Commercial/Industrial
MODEL SVE SERIES IV
INSTALLATION AND MAINTENANCE INSTRUCTIONS
3”- 12” SINGLE AND DOUBLE WALL
SPECIAL STAINLESS STEEL VENTING SYSTEM
FOR GAS BURNING APPLIANCES
CATEGORY II, III, & IV
UL1738 & ULC S636
Read the following before installation of Z-Vent
٭ Examine all components for possible shipping damage prior to installation.
٭ The Z-Vent system must be free to expand and contract. Check for unrestricted vent movement
through walls, ceilings and roof penetrations.
* The vent system must
be properly supported “DURING ASSEMBLY” vertically & horizontally as
prescribed in this manual. Failure to support the components at the point of install will cause
undue
stress on the joints of the components and fittings thereby voiding warranty.
٭ Proper joint assembly is essential for a safe installation. Follow these instructions exactly as written.
Check the connection of all joints during and after completion of assembly for proper insertion
depth and check gear clamps of single wall vents for proper torque.
٭ Different manufacturers have different joint systems and adhesives. Do Not Mix Pipe, Fittings or
Joining methods from different manufacturers beyond the flue collar adaptor.
WARNING: CONDENSATION WITH HIGH ACID CONTENT MAY BE PRODUCED DUE TO
UNFORESEEN CONDITIONS. THE HEATING APPLIANCE AND VENTING SYSTEM SHOULD BE
INSPECTED BY A LICENSED CONTRACTOR ON AN ANNUAL BASIS FOR POSSIBLE SIGNS OF
DETERIORATION DUE TO RUSTING OR PIN HOLES. CONDENSATION WITH HIGH ACID CONTENT
MAY CAUSE LEAKAGE OF HARMFUL GASES WHICH CAN CAUSE NAUSEA, FAINTING OR
DEATH. IF DETERIORATION IS DETECTED, IMMEDIATELY CEASE USE OF THE HEATING
SYSTEM AND CALL FURNACE / BOILER INSTALLER FOR REMEDIAL ACTION.

Summary of content (18 pages)