$7; 0,' 72:(5 3& &$6( 8VHU V 0DQXDO ೠ Ӗ &OHMJTI 7FS
Z9 U3 1 Cautionary Note 1) Please read this manual thoroughly prior to installation. 2) Before installing, check the components and condition of the product, and if any problem is found, contact the retailer. 3) Avoid inserting objects or hands into the system while it is in operation to prevent product damage and injuries. 5) Do not block the front intake vent or the rear exhaust vent. ENG 4) Check the manual when connecting cables.
Z9 U3 2 Product Details 6SHFLᚏFDWLRQV Models Z9 U3 7\SH $7; 0LG 7RZHU 'LPHQVLRQV :+' : [ + [ ' PP [ [ ರ :HLJKW NJ OE 0DWHULDOV 3ODVWLF 6WHHO &RORU %ODFN 0RWKHUERDUG &RPSDWLELOLW\ 6WDQGDUG $7; P $7; 3RZHU 6XSSO\ &RPSDWLELOLW\ 6WDQGDUG $7; $7; 9 3&, $*3 &DUG &RPSDWLELOLW\ )XOO 6L]H ᓔ 'ULYH %D\V ([WHUQDO %D\ [ ಯ ([WHUQDO %D\ [ ,QWHUQDO %D\ [ ರ LQ +RW VZDS ([SDVLRQ &DUG 6ROWV 6ORWV ,
Z9 U3 3DUWV ENG User manual 6WDQG 2II î Main Unit %ROW $ PP î [PSU, PCI] %ROW % 0 PP î [M/B, FDD, SSD] %ROW & 0 PP î > ´%D\ 2''@ %ROW ' PP î [3.5” Bay HDD] %ROW ( PP î [3.5” HDD] +'' $QWL YLEUDWLRQ UXEEHU î [3.
Z9 U3 3 Installation (1) Side Panel Removal ② ① (2) Motherboard Installation 7KHUH DUH 6WDQG 2IIV SUHLQVWDOOHG 3OHDVH UHIHU WR WKH GLDJUDPV EHORZ IRU DGGLWLRQDO 6WDQG 2II SRVLWLRQV EDVHG RQ PRWKHUERDUG W\SH P $7; %RDUG ATX Board or 6WDQG 2II B Bolt 4
Z9 U3 (3) 5.25” and 3.5” Drive Installation 1) Front Cover Removal ENG PULL 2'' ,QVWDOODWLRQ Bolt C 3) 2.5” / 3.
Z9 U3 ② Attach Drive to Tray A. 3.5” FDD Installation B. 3.5” HDD Installation D D H 5” 3. 5” 3. FD D Bolt B Bolt A C. 2.5” SSD Installation D SS Bolt B (4) Front Cover Installation When removing the front cover, the power switch and extension cable are separated to prevent disconnection. Be sure to connect them before installing the front cover.
Z9 U3 (5) 3.5” HDD Installation D D H Bolt D +'' $QWL vibration rubber ENG When transporting an assembled system, please secure the HDD with Bolt E as shown above. When removing HDD, pull the fastening lever outwards and then remove it.
Z9 U3 , 2 3RUW 86% RU 86% 0RWKHU%RUDG , 2 MotherBoard Ȅ 3RZHU DQG , 2 SRUWV WR FRQQHFW SOHDVH UHIHU WR \RXU PRWKHUERDUG PDQXDO Ȅ 3URGXFW GHVLJQ DQG VSHFL¿FDWLRQV PD\ EH UHYLVHG WR LPSURYH TXDOLW\ DQG SHUIRUPDQFH ´ +'' 66' 2SWLRQDO 2.5" HDD and SSDs can be installed on the right side of case as shown in the diagram below.
Zalman Tech Co., Ltd. GDHU\XQJ 7HFKQR 7RZQ ,,, *DVDQ GRQJ *XPFKXQ JX 6HRXO .RUHD 7HO )D[ ZZZ ]DOPDQ FRP H PDLO ]DOPDQ#]DOPDQ FRP Zalman USA, Inc.