ATX MID TOWER PC CASE Ver 1.
English
Z9 U3 1 Cautionary Note 1) Please read this manual thoroughly prior to installation. 2) Before installing, check the components and condition of the product, and if any problem is found, contact the retailer. 3) Avoid inserting objects or hands into the system while it is in operation to prevent product damage and injuries. 5) Do not block the front intake vent or the rear exhaust vent. ENG 4) Check the manual when connecting cables.
Z9 U3 2 Product Details (1) Specifications Models Z9 U3 Type ATX Mid Tower Dimensions (W×H×D) 207(W) x 464(H) x 504(D)mm (8.1 x 18.2 x 19.8”) Weight 7.2kg (15.8 lb) Materials Plastic, Steel Color Black Motherboard Compatibility Standard ATX / m-ATX Power Supply Compatibility Standard ATX / ATX12V PCI/AGP Card Compatibility Full Size 290㎜ (11.4") Drive Bays External Bay x 3 3.5“ External Bay x 1, Internal Bay x 5 5.25"/3.5"/2.
Z9 U3 (2) Parts Main Unit ENG User manual Stand-Off × 5 Bolt A(#6-32*6mm) × 11 [PSU, PCI] Bolt B(M3*5mm) × 17 [M/B, FDD, SSD] Bolt C(M3*6mm) × 12 [5.25”Bay ODD] Bolt D(#6-32*4mm) × 20 [3.5” Bay HDD] Bolt E(#6-32*6mm) × 5 [3.5” HDD] HDD Anti-vibration rubber × 20 [3.
Z9 U3 3 Installation (1) Side Panel Removal ② ① (2) Motherboard Installation There are 4 Stand Offs preinstalled. Please refer to the diagrams below for additional Stand Off positions (based on motherboard type).
Z9 U3 (3) 5.25” and 3.5” Drive Installation 1) Front Cover Removal ENG PULL 2) ODD Installation Bolt C 3) 2.5” / 3.
Z9 U3 ② Attach Drive to Tray A. 3.5” FDD Installation B. 3.5” HDD Installation 5” 3. D D H 5” 3. D FD Bolt B Bolt A C. 2.5” SSD Installation SS D Bolt B (4) Front Cover Installation When removing the front cover, the power switch and extension cable are separated to prevent disconnection. Be sure to connect them before installing the front cover.
Z9 U3 (5) 3.5” HDD Installation HDD Bolt D HDD Antivibration rubber ENG When transporting an assembled system, please secure the HDD with Bolt E as shown above. When removing HDD, pull the fastening lever outwards and then remove it.
Z9 U3 I/O Port MotherBorad I/O MotherBoard ※ Power and I / O ports to connect please refer to your motherboard. manual. (7) 2.5” HDD / SSD Optional 2.5" HDD and SSDs can be installed on the right side of case as shown in the diagram below. Bolt B (8) Optional Fan Installation and Replacement Top Panel Fan (120/140 mm) Installation When installing fan, press the Top Panel’s eight Hook’s towards each other to remove and install as shown in diagram below. The Z9U3 comes with one 120mm Fan pre-installed.
Zalman Tech Co., Ltd. #1007 daeryung Techno Town III, 448 Gasan-dong, Gumchun-gu, Seoul, 153-803,Korea Tel: +82-2-2107-3232 / Fax: +82-2-2107-3322 / www.zalman.com / e-mail: zalman@zalman.com Zalman USA, Inc. 10531 Garden Glove Blvd., Garden Grove, CA 92843, U.S.A Tel: +1-714-530-0700 / Fax: +1-714-530-0707 / www.zalman.com / e-mail: zalman@zalmanusa.