User's Manual

© 2014 Motorola Solutions, Inc. All Rights Reserved.
February 12, 2014
80073681.A
MOTOROLA, MOTO, MOTOROLA SOLUTIONS and the Stylized M Logo are trademarks or registered trademarks of Motorola Trademark
Holdings, LLC and are used under license. All other trademarks are the property of their respective owners..
2. Product Installation
Before installing a module in the WORKABOUT PRO 4, all power sources must be turned off.
Remove the batteries. If your unit is using AC power, disconnect it.
With the power shut down, you can install the RFID Module HF/LF.
Connect the USB cable on the RFID Module.
Slide the RFID Module in the PCB guide.