Installation Guide
AP 7181 Access Point: Installation Guide
30
The power cable included with the AP 7181 is a flying lead cable. Most installations will
require the installer to install an additional power cable.
The AP 7181 flying lead power cables are 12 feet long. The installer should splice the
power cable to the AP 7181 flying lead cable in accordance to the National Electric Code
(NEC) or wiring requirements in the country of operation. Only outdoor rated power cable
should be used.
10. Once the power cable has been prepared, connect the power cable to the unit.
CAUTION AC versions of the AP 7181 require an input voltage of 100 -
240 VAC. DC versions require an input voltage of 41-58 VDC.
!