User`s manual

25
japv
Company Confidential
Installing Laminate Ribbon
Position the Laminate As
Shown
The Registration Marks
Should Be on Top and the
slot in the take-up core
should be on the bottom
Unwind Enough Laminate to
Reach the Empty Take-up
Core and Tape Down
Wind At Least 1 Complete
Turn of Laminate Onto The
Take-up Core
Feed Roll
Take Up Core
Registration Marks