Owner's Manual

24
Tempest I Use, Care, and Installation Guide
TEMPEST I
UNDERCABINET
PRO
Installation Instructions
PBD-1200A Dual Blower Installation
7. Dual Blower screw mount
locations.
8. Connect blower wire extension
cable from PBD-1200A kit to new
blower. Connect both blower
plugs.
9. Place 10” round adapter
(included with PBD-1200A) on
top of hood and secure with (4)
M3.5 x 8 screws.
NOTE: To secure the 10” transition adapter to top of hood a cut out of 14 1/2” width x 10 1/2” depth
will need to be made in the cabinet bottom.
If internal cabinet dimensions prevent this size of a cut out then the 10” transition adapter may be
mounted to the cabinet bottom rather than the top of the hood. Cut out dimensions for this type of
installation are 13 1/4” width x 6 1/4” depth.