Use, Care, and Installation Guide www.zephyronline.com In-Line Blower PBN-1000A Model number: Serial Number: JUL08.
www.zephyronline.
INSTALLATION Ductwork Calculation Sheet ................................... Blower Positions .......................................................... Specifications ............................................................... Mounting the Blower .................................................. 1 4 5 6 7 Table of Contents SAFETY NOTICE ................................................................. 2 LIST OF MATERIALS .......................................................
www.zephyronline.com Important Safety Notice READ AND SAVE THESE INSTRUCTIONS ! FOR DOMESTIC COOKING ONLY ! WARNING WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS, OBSERVE THE FOLLOWING: 1. Use this unit only in the manner intended by the manufacturer. If you have questions, contact the manufacturer at the address or telephone number listed in the warranty. 2.
PARTS SUPPLIED 1 - In-Line blower 2 - Mounting brackets 1 - 10” to 8” transition 1 - Hardware package HARDWARE PACKAGE CONTENTS (4) M4 x 1-1/2” (8) M4 x 8 PARTS NOT SUPPLIED - Ducting, conduit, wiring and all installation tools - Cable connector (if required by local codes) - Range hood 3 List of Materials MODEL: PBN-1000A
Installation – Ductwork Calculation Sheet www.zephyronline.com Equivalent number length x used = Duct pieces Equivalent number length x used = Duct pieces Total Total 3-1/ 4” x 10” 1 Ft. Rect., straight x( ) = Ft. 6” Round 30 Ft. wall cap with damper x( ) = Ft. 6” Round, straight 1 Ft. x( ) = Ft. 6” Round, roof cap x( ) = Ft. 7”-10” Round, 1 Ft. x( ) = Ft. 6” round to 1 Ft. 3-1/ 4” x 10” rect. transition x( ) = Ft. 3-1/ 4” x 10” 15 Ft. Rect.90 0 elbow x( ) = Ft.
4 5 2 outlet 1 outlet outlet Plywood 3 WARNING: Check installation position so that the blower outlet is exhausting air away from the hood and out of the home. 1. 2. 3. 4. 5.
front side (bracket positions) 1 9/16” outlet outlet 7 5/16” bracket 2 6 13/16” 15 7/8” 20 15/16” 1 11/16” 1 3 20 3/8” 4 1/ 16 ” 21 7/8” 23 7/16” 14 3/16” 6 11 13/16” 10 8 5/8” 6” 14 5/8” 5/1 10 3/8” 91 7 5/16” bottom (inlet) top (outlet) 5 1/2” Installation – Specifications www.zephyronline.
2. Run 10” round ducting to inlet and outlet of in-line blower housing. Secure with aluminum duct tape. Note: Cheng and Arc Collection hoods require a 10” to 8” round transition to be installed prior to the duct passing through the ceiling. 8” round ducting is then connected to the hood. A 10” to 8” transition is included with the blower. FIG. B 3. Run electrical conduit per local codes from junction box on top of in-line blower to blower wiring harness on top of the range hood.