Quick Start Installation Guide Zip HydroTap G5 Command Centre Boiling/Chilled models AFFIX PRODUCT LABEL HERE Australia UK Visit our website to download the manuals Quick Start Installation Guide 807118 v1.00 01.
Table of contents SECTION 1: Using the instructions.......................................................................3 SECTION 2: IMPORTANT SAFETY INSTRUCTIONS.............................................. 4 SECTION 3: WARNINGS AND REGULATORY INSTRUCTIONS............................. 6 SECTION 4: Technical data ................................................................................ 8 SECTION 5: Supplied parts checklist.................................................................
SECTION 1: Using these instructions Before you start ! This document is a Quick Start Installation Guide. For further details on installing and operating your HydroTap download & read the Command Centre installation and user instructions , which can be found online at: (Australia) www.zipwater.com (UK) specify.zipwater.co.uk Read and use the instructions supplied with individual kit components for a safe installation.
SECTION 2: IMPORTANT SAFETY INSTRUCTIONS ! Compliance In Australia electrical installation must comply with AS/NZS3000. In Australia plumbing installation must comply with AS/NZS3500. In Australia For residential chilled models, all refrigeration must comply with AS/NZS 60335.2.24. In the UK the system must be installed in accordance with water supply byelaws, current IEE regulations and local authority byelaws.
SECTION 2: IMPORTANT SAFETY INSTRUCTIONS Venting Sometimes steam and / or boiling water droplets may discharge through a vent outlet on the tap. If not using the font, ensure the tap body is located so the tap outlet safely dispenses into the sink bowl. Lifting Take care when lifting. The Command Centre may exceed safe lifting limits. If you feel this is beyond your personal capabilities, please seek assistance with the lift. The weight of the Command Centre is marked on the packaging.
SECTION 3: WARNINGS & REGULATORY INFORMATION ! • For continued safety of this appliance it must be installed, operated and maintained in accordance with the manufacturer’s instructions. • This appliance may deliver water at high temperature. Refer to the Plumbing Code of Australia (PCA), local requirements and installation instructions to determine if additional delivery temperature control is required.
SECTION 3: WARNINGS & REGULATORY INFORMATION • Valve and fitting threads must be sealed appropriately with PTFE tape where compression seals are not provided. • Always flush new filter before use. • Do not connect Booster to electrical supply until commissioning. • Do not over tighten plumbing and hose connections. • Braided hoses supplied cannot be lengthened. • The power cord and general power outlet must be in a safe and accessible position after installation.
SECTION 4: Technical data Model BC100 BC100 H BC60 BC60 H BC40 BC40 H BC30 BC30 H BC20 BC20 H BC Home Power rating kW Dimensions W x D x H (mm) Weight (kg) 2.1 + 2.2* 450 (500)# x 470 x 333 30 2.1 450 (500)# x 470 x 333 30 1.97 450 (500)# x 470 x 333 30 1.9 + 2.2* 280 x 470 x 333 23 1.9 280 x 470 x 333 23 1.44 280 x 470 x 333 30 * power rating of the booster #Including vent tray Electricity supply requirements 220-240V 50Hz AC (for power requirement see table above).
SECTION 4: Technical data Water supply pressure requirements Min - Max pressure, kPA (bar) Component HydroTap Vented Mixer Tap Booster Limescale filter Australia UK 170 (1.7) - 700 (7.0) 300 (3.0) - 700 (7.0) 200 (2.0) - 700 (7.0) 200 (2.0) - 700 (7.0) 170 (1.7) - 500 (5.0) 200 (2.0) - 500 (5.0) 200 (2.0) - 500 (5.0) 200 (2.0) - 500 (5.0) A pressure limiting valve must be fitted for mains water pressures above the maximum limits stated above in accordance with local plumbing regulations.
SECTION 5: Parts supplied Parts supplied with the HydroTap BC for Work BC H for Work BC for Home Tap HydroTap tap HydroTap pipes, tubes hoses and fittings Separate vented Mixer tap kit Separate Mains mixer Tap Optional Optional Separate Mains mixer Tap fittings Optional Optional Separate Mains mixer Tap instructions Optional Optional Command Centre Mains electrical supply cable Water supply inlet hose Water supply inlet adaptor and strainer Ve
SECTION 6: Set up the ventilation ! Use of tools can be hazardous. Assess the risks before you start. Use instructions supplied with individual kit parts. 200mm ! A clearance envelope around all Command Centres must be provided to allow ventilation for the safe and effective use of the HydroTap system. 50mm Comm 50mm and Ce Quick Start Installation Guide 807118 v1.00 01.
SECTION 6: Set up the ventilation BC100 - BC40 models • Cold air is drawn in through the inlet vent and gap provided by the door buffers. • Inlet vent is mounted over cupboard side, door or floor cut-out (see below). • Warm air is exhausted through vent tray. • Observe 100mm inlet / outlet vent separation (see below). ! The vent tray must be fitted. It provides a safe exhaust for refrigerant gas in the unlikely event of a leak.
SECTION 6: Set up the ventilation BC30, BC20 & Home models • Cold air is drawn in through the inlet vent and lower gap provided by the door buffers. • Inlet vent is mounted over cupboard side, door or floor cut-out. • Warm air is exhausted through upper gap provided by the door buffers. Air outlet 4mm door buffers (supplied) Air inlet Inlet vent All models If cupboard temperature exceeds 35°C, additional ventilation is required.
SECTION 7: Connect the water supply ! Valves and fittings must be sealed with PTFE tape if compression seals are not included. Note Mixer tap installations also use a ‘Tee piece’ as part of the water supply plumbing connections, see the Tap installation instructions supplied with the Mixer Tap to connect the water supply if using the mixer tap option. Note correct strainer orientation.
SECTION 8: Set the bypass & install the limescale filter Available as optional accessory - UK only. For filter head and scale filter installation use the guide supplied with the filter head and filter respectively. Water out Bypass in see pages 19,20 Water in Bypass out see pages 19,20 Insert Remove Insert Bypass valve (Rear of the Command Centre) Remove Quick Start Installation Guide 807118 v1.00 01.
SECTION 9: Fit the Booster • Supplied with selected models, or available as an optional accessory. Booster c 10⁰ a b 15⁰ d f e Note Take care not to break the clips when removing or installing the Booster. 16 Quick Start Installation Guide 807118 v1.00 01.
SECTION 10: Connect the Booster Booster ! ! Do not connect to electrical power until commissioning. Do not over tighten hose connections. Braided hoses supplied cannot be lengthened. Cold water into Booster, connect to Command Centre BYPASS OUT see pages 19,20 Strainer Hot water out of Booster, connect to Command Centre BYPASS IN see pages 19,20 3/8" BSP connections Booster Quick Start Installation Guide 807118 v1.00 01.
SECTION 11: Connect the Command Centre Generic installation instructions For HydroTap, mixer tap and any optional accessories, use instructions supplied with individual kit components. Mains power cable USB Tap Braided hose HydroTap Do not connect to the mains socket until commissioning ! Command Centre Installation diagrams are for illustrative purposes only. Hoses are not shown to scale and cannot be lengthened.
SECTION 11: Connect the Command Centre USB NG BYPASS VENT T IN BYPASS OUT Zip Vented Mixer Tap Mains connections Water (if supplied) BLUE BC comm CHILLED OUTLET RED Limescale Filter Fit foam insulation (supplied) to the BLUE pipe Booster ! CLEAR MAINS IN USB hich way round arkling ARKLING OUTLET Booster (selected models) and limescale filter (optional) BC40, BC60, BC100 models CHILLED OUTLET Example installation MAINS IN BC res MAINS IN MIXER OUT MIXER BOILING BYPASS VENT IN OUT IN
BC20, BC30, BC Home models USB Booster (selected models) and limescale filter (optional) BC comm Zip Vented Mixer Tap Mains connectionsCHILLED OUTLET Water (if supplied) BYPASS OUT USB RED MAINS IN Limescale Filter ! Booster T SECTION 11: Connect the Command Centre MIXER OUT MIXER BOILING BYPASS VENT IN OUT IN Fit foam insulation (supplied) to the BLUE pipe BYPASS OUT BLUE CLEAR BC res MAINS IN USB MAINS IN MIXER OUT MIXER BOILING BYPASS VENT IN OUT IN Example installation CHILLED O
SECTION 12: Commissioning ! ! 1 See User Guide 5 7 Unpack, moisten o-rings & fit filter Boiling calibration 2 8 Filter flush Boost enable if Booster fitted Connect electricity 3 9 Monitor display screen Flush 10 Litres through 4 6 TANK FLUSH 12:12 PM Power off Pull levers forward Power on Follow the prompts to flush fresh water through the tank/s 3 times as shown by the cycle counter/s. The tank/s will fill automatically but when prompted use the tap to dispense and empty.
Notes 22 Quick Start Installation Guide 807118 v1.00 01.
Notes Quick Start Installation Guide 807118 v1.00 01.
Refer to User Guide for operation and maintenance. Zip Water (Australia) Pty Ltd ABN 46 000 578 727 67 - 77 Allingham Street, Condell Park NSW 2200 Postal: Locked Bag 80, Bankstown 1885 Australia Tel (+612) 9796 3100 Free call 1800 947 827 (1800 ZIP TAP) www.zipwater.com AU02691 WMKA00099 AS 3498 Zip Water UK Trafalgar House, Rash’s Green, Dereham, Norfolk, NR19 1JG 0345 6 005 005 sales@zipindustries.co.uk specify.zipwater.co.uk 24 Quick Start Installation Guide 807118 v1.00 01.