Operating instructions

10 Litre models 38 minutes 40 minutes
Page 6 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - February 2004
Alternatively attach a tun dish to the wall as shown and plumb away to waste.
Wall mounted tundish - p/n 99017
Sink mounted tundish- p/n 99018
c) Electrical
For concealed electrical connection, connect a power cable from the
rear of the heater to the terminal block within the heater as shown.
Do not turn the power ON until the heater is filled with water.
n
tinued
continued
Step 4 - Assembling
Place the heater case back onto the chassis and secure the two top and four
bottom fixing screws.
Screw the tap assembly clockwise onto the tap outlet tube using PTFE tape.
Screw the tap clockwise until the tap assembly touches the fascia without
pressure.
Continue to turn the tap a further one full turn until the tap lever is upright.
Step 5 - Commissioning
Check previous steps. Turn water supply ON, check connections for leaks.
Turn tap handle to the “lock down” side and leave open until water starts
flowing from the outlet. Return the handle to the closed position to stop water
flow and turn the handle 180º to the “cup fill” position.
See page 8 for LED Display information.
Turn power on. After a short time, boiling water will be available and will be
maintained close to boiling point thereafter. Initial heating periods are:
Inlet water temperature 15°C 10°C
15 Litre models 40 minutes 43 minutes
25 Litre models 47 minutes 50 minutes
40 Litre models 60 minutes 64 minutes
Installation Procedures continued
Thermostat
Contactor
Cold inlet
Terminal Block
Vent