Instructions / Assembly
Table Of Contents
6. Insert batteries.
7. Mark and drill holes for the strike box and plate.
1.
2.
Make sure that the strike box is in level of latch bolt, then use
installation template to drill holes.
Align the strike box and plate with the drilled hole and use
screws A to secure them.
Insert the lithium battery and
install the battery cover.
Note: Eight alkaline batteries are
optional.
Screws A
58(mm)
(2-36/127")
(215/254")
(1-48/127")
2(mm)
(10/127")
14(mm)
(70/127")
35(mm)
(1-18/127")
29(mm)
21.5(mm)
depth
depth
9
ENGLISH