Installation Sheet

2524
Island CrownSound
®
d Installation
Designer Island Hood Installation
DESIGNER ISLAND HOOD INSTALLATION
6. Slide chimney pieces over the angle iron on the hood. Pull the electrical plug to
the top of the chimney sections. Figure 4
7. Lift the hood to attach the angle iron to the ceiling bracket. Use screws provided
to attach.
8. Make your electrical and ducting connections. Use rigid duct wherever possible.
Try and minimize the use of elbows. More elbows and longer runs create higher
static pressure. The hood comes with a grounded three prong plug that can be
plugged into a 15 amp circuit. The cord is 36” long.
9. Slide top chimney piece up over the mounting bracket on the ceiling and secure
it in place with the provided screws. Figure 5
10. Install stainless steel baffle filters. Before installing baffle filters, make sure that
you insert the grease cup under the motor blower.
With any of our wooden or copper range hoods, you can custom cut the
chimney to the desired height and the crown molding will hide any jagged
cuts and offer a seamless transition to the ceiling.
The range hood is very heavy. Use the buddy system to keep the chimney
in place while screwing in the hood into the brackets.
Figure 4
Figure 5
WARNING
WARNING
ISLAND CROWNSOUND
®
INSTALLATION
ELECTRIC POWER RATING
Frequency: 110V/50 Hz
Power: 10W
1. Attach crown molding bracket to ceiling using hardware provided. Figure 1
2. Attach ducting and electrical connections. Plug the speakers into an outlet
behind the chimney. When the connection is successful, a chime will sound.
Figure 2
Screw:A/C/D
Screw:E
Screw:H
Figure 2
Figure 1
Installation Tutorial Video
Watch Now
Screw:A/C/D
Screw:E
Screw:H
Screw: H
Screw: E
Screw: A/C/D