Installation Sheet

2928
Screw
Screw
Screw
Under Cabinet Installation
RECIRCULATING KIT
1. Open package, locate all necessary hardware. Included should be 4 screws
with 4 washers.
2. Line up the recirculating kit with the top of the range hood.
3. Secure the recirculating kit with the provided screws. Once secure, begin
tightening each screw until the recirculating kit is flush with the range hood.
4. Install undercab per range hood installation guide.
29 ¾“ - 35 ¾“
4 ¾”
11
7
8
No time to read?
Scan for a quick video.
Undercabinet Recirculating Kit
Step 1:
Open package, locate all neccessary hardware. Included should be
4 screws with 4 washers.
Step 2:
Line up the recirculating kit with the top of the range hood.
Step 3:
Secure the recirculating kit with the provided screws. Once secure,
begin tightening each screw until the recirculating kit is flush with the
range hood.
Step 4:
Install undercab per range hood installation guide.
29 ¾“ - 35 ¾“
4 ¾”
11
7
8
No time to read?
Scan for a quick video.
Undercabinet Recirculating Kit
Step 1:
Open package, locate all neccessary hardware. Included should be
4 screws with 4 washers.
Step 2:
Line up the recirculating kit with the top of the range hood.
Step 3:
Secure the recirculating kit with the provided screws. Once secure,
begin tightening each screw until the recirculating kit is flush with the
range hood.
Step 4:
Install undercab per range hood installation guide.
UNDER CABINET INSTALLATION
Under Cabinet Installation
PREPARATION
Decide the location of the venting pipe from the hood to the outside.
Check hood for clearance.
For installing under the cabinet with recessed bottom, attach 4-inch wide wood
filler strips (not provided) on each side.
Puncture the knockout holes (for mounting under the cabinet) on the hood.
Use rigid ducting wherever possible. Try and minimize the use of elbows. It is
recommended to establish 15-20” of vertical airflow from the top of the hood
before executing a 90° turn or elbow. More elbows and longer runs create
higher static pressure. No more than two to three elbows are recommended. Use
40 feet of ductwork max. The hood comes with a grounded three prong plug
that can be plugged into a 15 amp circuit.
1. Measure distance between stove top and the bottom of the range hood. A
distance of 30” to 36” is recommended.
2. Attach mounting brackets to the back of the hood.
3. Mark the leveling point of the hood. Position two mounting screws on the wall,
leaving ¹/” space away from the wall. Make sure that you are mounting the
hood to a secure backing to hold the weight of the hood.
4. Tighten ducting (provided) with the hose clamp provided. Use silver or duct tape
wherever needed.
5. Draw electrical wires through cabinet access opening, center the hood beneath
the cabinet.
6. Align hood-mounting brackets to the screws on the wall and hook hood into
place. Tighten screws to secure hood to the wall.
7. Connect ducting.
UNDER CABINET INSTALLATION