Brochure
6
© All rights reserved. ZOELLER PUMP CO. | 502-778-2731 | 800-928-7867 | www.zoeller.com
BASINS & PACKAGE SYSTEMS
Qwik Pak LS Commercial Duty
• 24”(61cm)diametersimplexunitsavailablein
60”or84”(152or213cm)depths
• 36”(91cm)diameterduplexunitsavailablein
60”or84”(152or213cm)depths
• Fiberglassbasinwithanti-oatationdeviceandsolid
outdoor-rated, fiberglass cover
• 4”pipeseal(looseforeldinstallation)
• DuctileironZ-Rail™disconnectsystemforeasypump
removal
• 1.25”,1.5”or2”sliderailassemblyforuseonmultiplepumps
• Stainlesssteelliftcable(s)
• 2”PVCballvalveand2”castironcheckvalve
• 2”SCH.40PVCdischargepiping
• (3)15’(5m)variableleveloatswitcheswithinstalled
float tree
• Kitsavailableforcommercialdutyefuent,sewageor
grinder pumps
• Canbeusedwithsmallerresidentialpumpswith
adaptor(consultfactory)
• Accessriserassemblies
• Junctionboxes
• Outdoorvents
• 24”(61cm)diametersimplexunitsavailablein60”-96”
(152-244cm)standarddepths
• 36”(91cm)diameterduplexunitsavailablein60”-96”
(152-244cm)standarddepths
• Basinsupto72”(183cm)diameteror144”(366cm)depths
are available – consult factory
• Fiberglassbasinwithanti-oatationdevicewithsolid,
outdoor-rated, fiberglass cover
• 4”pipeseal(looseforeldinstallation)
• Zoeller“squareguide”disconnectsystemforeasypump
removal
• 1.25”,1.5”or2”dischargecongurationsforuseonmultiple
pumps
• Stainlesssteelliftcable(s)
• PVCballvalveandcastironcheckvalveinstalled
• Sch.40PVCdischargepiping
• Covermaterial(steel,berglass,gas-tight,indooretc.)
• Customvalveboxes(attachedanddetached)
• Stainlesssteelandbronzenon-sparksystemsforhazardous
environment pumps
• Customdesign/buildpackagesystems
Wastewater
Universal Lift
Station
Prepackaged Lift
Station
While current systems require
the pump to be included in
the package, the Qwik Pak
LSallowsaZoeller pump to
be purchased separately or
provided from existing stock.
Gone is the headache of having
to purchase a pump that you
may already have in stock! The
QwikPakLSisdesignedtobe
used in dewatering, sump,
effluent, sewage or grinder systems. The piping configuration
provides the exibility for up to a 2” discharge. Use the
Qwik Pak LS when a speedy installation is required.The
prepackaged station, in conjunction with an accessory kit,
provides everything required to install a complete system.
The discharge piping is installed along with the check valves
and ball valves.
The Zoeller prepackaged unit is
designed to be an all-inclusive
lift station. With the rail system,
variable level floats, discharge
piping and optional junction
box installed along with the
submersible pumps and control
panel, all the contractor has to do
isinstallthe4”hub,digthehole
and attach the discharge piping.
The configurations shown in
our catalog are just the tip of the
iceberg. Zoeller’s engineering and
manufacturing staff can design-
build ALMOST any prepackaged
system that can be imagined!
Whether the system is designed
for a dewatering, effluent, sewage
or grinder pump, all components
are guaranteed to work when they
arrive at the jobsite due to the fact that EACH system is
reviewed for compatibility prior to being built and then tested
for proper fit after assembly.
922-0009 pictured