UTR-20 Assembly Instructions

10
Step 4: Top Rail Attachment:
NORTH
SOUTH
Diagram 4a
Remove the remaining rail from the box and position as shown in Diagram 4a & 4b.
Slide the rail U-brackets over the canisters and slide the entire rail up against the axle assembly, making
sure to seat the axle into the bearing on the top rail.
NORTH
SOUTH
Diagram 4b