UTR-20 Assembly Instructions
13
Step 7: Shadow Plate Installation:
NORTH
SOUTH
(4) 1/4"-20 x 3/8" ZP ROUND HEAD SLOT SCREWS
(4) 1/4" SS LOCK WASHERS
(4) 1/4" ZP FENDER WASHERS
SHADOW PLATES
Diagram 7
• Remove the shadow plate hardware bag from within the main hardware bag. There will be one extra set of
hardware.
• Screw the ¼” round head slot screws through the lock washer and then the fender washer, through the
shadow plate and into the welded rectangular nuts on the canisters.
• Make sure that the Zomeworks logo is right side up on one of the shadow plates.
• The tracker will NOT function WITHOUT the shadow plates installed.










