UTR-20 Assembly Instructions
6
• The pole may be filled with concrete for added strength (only to approximate ground level).
• Allow concrete and pole to set for a minimum of 36 hours BEFORE installing the Track Rack™.
MOUNTING POLE RECOMMENDATIONS:
40" 29"
6"
(6-
5
8
" OD)
6"
(6-
5
8
" OD)
SCHEDULE 40
STEEL PIPE
SLOPE AWAY FROM
POLE FOR DRAINAGE
F-Series
UTRF168
CONCRETE
EARTH
72"
144"
8"
(8-
5
8
" OD)
30" diameter
Pipe set in
concrete
169" EW
120" NS
168 Sq. Ft. of
Module Area
POLE INSTALLATION DETAIL
18" to 30"
50"
F-Series
UTRF90
60"
120"
54"
108"
Description
Min. Pole Height
Min. Pole Depth
Minimum
Schedule 40
Steel Pipe
F-Series
UTRF64
6"
(6-
5
8
" OD)
96"
48"
24" diameter
Pipe set in
concrete
146" EW
120" NS
90 Sq. Ft. of
Module Area
Minimum
Recomended
hole diameter
Rack
Dimensions
(up to but NOT to
exceed Sq. Ft.)
124" EW
80" NS
64 Sq. Ft. of
Module Area
24" diameter
Pipe set in
concrete
Ground Clearance at
45° Tilt N/S & E/W
33"21"30"
F-Series
UTRF120
146" EW
120" NS
120 Sq. Ft. of
Module Area
24" diameter
Pipe set in
concrete
Universal
UTR-020
76"
2.5"
(2-
7
8
" OD)
18" diameter
Pipe set in
concrete
67" EW/
44" NS
20 Sq. Ft. of
Module Area
38"
K-Series
UTRK-040
84"
3"
(3-
1
2
" OD)
18" diameter
Pipe set in
concrete
124" EW/
48" NS
40 Sq. Ft. of
Module Area
42"
IMPORTANT NOTE: TO MINIMIZE CONFUSION DURING INSTALLATION MOST
OF THE HARDWARE MENTIONED IN THE FOLLOWING STEPS WILL COME
PARTIALLY ASSEMBLED ON THEIR RESPECTIVE PARTS. WHEN RE-
INSTALLING THE HARDWARE PLEASE MAKE SURE TO FOLLOW DIAGRAMS
EXACTLY TO MINIMIZE POSSIBILITY OF DAMAGE TO TRACKER.










