
7
Step 1: Laying out the canister set:
SOUTH
NORTH
Diagram 1
• Remove Canister set from box and carefully unwind the copper transfer tube and place on the ground or
work surface as shown. Make sure canister tabs are on the bottom.
Step 2: Bottom Rail attachment:
Diagram 2a