UTR-20 Assembly Instructions
8
• Separate the top rail and bottom rail and slide the bottom rail in between the canister tabs and the crossover
tube.
NORTH
SOUTH
Diagram 2b
• Remove the 3/8” Bolts, Washers and Nylock Nuts from the Hardware bag and insert them through the
bottom rail and canister tabs as shown and tighten completely.
• Secure the 4-UV Cable Ties around both the bottom rail and the transfer tube, making sure not to pinch the
transfer tube between the cable tie and the bottom rail. This step can be completed at a later time if so
desired.










