User's Manual
Table Of Contents
- FCC & IC STATEMENT
- FCC Radiation Exposure Statement
- About This Manual
- Chapter 1 System Description
- Chapter 2 System Structure
- Chapter 3 Indices
- Chapter 4 Networking
- Chapter 5 Application
- Chapter 6 Hardware Installation
- Figures
- Tables
- Glossary
Chapter6HardwareInstallation
Figure6-20GPSAntennaVerticalInstallation
1.GPSsettledclamp
2.Feeder
3.Feederstrip
4.GPSantenna
5.Mountingpole
6.U-shapeclamp
6.5.1.2InstallingaGPSAntennainHorizontalPlacement
Prerequisites
ConrmtheinstallationmodeandinstallationpositionofGPSantenna.
Thefollowingtoolsmustbeready.
lAdjustablespanner
lNormalspanner
Context
lItisrecommendedtohaveapolewithadiameterbetween30mm~60mm(48mm
isoptimal).
lThepoleusedtoxtheGPSantennamustbegroundedwell.
lTheantennacannotbeinstalledduringrainandheavywind.
Steps
1.OpenthepackageandtakeouttheGPSantennaandGPSrack.
2.UsetheU-shapeclamptoinstalltheGPSracktothemountingpole.
3.TheinstallationsupportofGPSantennaisasshowninFigure6-21.Alignholeson
theU-shapeclampwithHole1andHole3,orHole4andHole6ontheinstallation
support.Thencoveraspringwashandatwasherrespectivelyontheseholesand
fastenthemwithM6screws,asshowninFigure6-22.
6-21
SJ-20110329145303-001|2011–10–25(R1.1)ZTEProprietaryandCondential