ZXC10 CBTS O1 CDMA2000 Outdoor Compact BTS - O1 Installation Manual ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China 518057 Tel: (86) 755 26771900 800-9830-9830 Fax: (86) 755 26772236 URL: http://support.zte.com.cn E-mail: doc@zte.com.
LEGAL INFORMATION Copyright © 2005 ZTE CORPORATION. The contents of this document are protected by copyright laws and international treaties. Any reproduction or distribution of this document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by contractual confidentiality obligations.
ZTE CORPORATION Values Your Comments & Suggestions! Your opinion is of great value and will help us improve the quality of our product documentation and offer better services to our customers. Please fax to: (86) 755-26772236; or mail to Publications R&D Department, ZTE CORPORATION, ZTE Plaza, A Wing, Keji Road South, Hi-Tech Industrial Park, Shenzhen, P. R. China 518057.
This page is intentionally blank.
Contents About this Manual .....................................................................................xi Purpose of this Manual ........................................................................................... xi Typographical Conventions..................................................................................... xi Mouse Operation Conventions.................................................................................xii Safety Signs.........................................
Unpacking Carton ................................................................................................. 26 Carton Structure ...................................................................................................................26 Unpacking Procedure.............................................................................................................26 Unpacking Precautions...........................................................................................................
Antenna Installation Technical Parameters..............................................................................63 Antenna Installation Flow Chart..............................................................................................64 Selecting Installation Position.................................................................................................64 Moving and Hoisting Antenna.................................................................................................
Board and Sensor Installation Check .................................................................... 102 Antenna and GPS Feeder System Installation Check .............................................. 103 1/2” Indoor Jumper.............................................................................................................103 Lightning arrester................................................................................................................103 Main GPS Feeder.......................
Tables ......................................................................................... 129 Index ..........................................................................................
This page is intentionally blank.
About this Manual Purpose of this Manual This manual describes ZXC10 Outdoor Compact Base Transceiver Station O1 hardware installation. Typographical Conventions ZTE documents employ the following typographical conventions. TABLE 1 - TYPOGRAPHIC AL CONVENTIONS Typeface Meaning Italics References to other guides and documents. “Quotes” Links on screens.
ZXC10 CBTS O1 Hardware Installation Manual Mouse Operation Conventions TABLE 2 - MOUSE OPERATION CONVENTIONS xii Typeface Meaning Click Refers to clicking the primary mouse button (usually the left mouse button) once. Double-click Refers to quickly clicking the primary mouse button (usually the left mouse button) twice. Right-click Refers to clicking the secondary mouse button (usually the right mouse button) once. Drag Refers to pressing and holding a mouse button and moving the mouse.
About this Manual Safety Signs TABLE 3 - SAFETY SIGNS Safety Signs Meaning Danger: Indicates an imminently hazardous situation, which if not avoided, will result in death or serious injury. This signal word should be limited to only extreme situations. Warning: Indicates a potentially hazardous situation, which if not avoided, could result in death or serious injury. Caution: Indicates a potentially hazardous situation, which if not avoided, could result in minor or moderate injury.
ZXC10 CBTS O1 Hardware Installation Manual How to Get in Touch The following section provides information on how to obtain support for the documentation and the software. Customer Support If you have problems, questions, comments, or suggestions regarding your product, contact us by e-mail at support@zte.com.cn. You can also call our customer support center at (86) 755 26771900 and (86) 8009830-9830.
Chapter 1 Installation Preparation This chapter describes: Hardware installation flow CBTS O1 installation precautions Environment inspections Installation location specifications Temperature and humidity requirements Power supply requirements Power consumption requirements Electromagnetic radiation protection Antenna feeder system requirements Other requirements Tool and meter list for installation Technical documentation preparation Project commissionin
ZXC10 CBTS O1 Hardware Installation Manual Hardware Installation Flow Figure 1 shows ZXC10 Compact BTS (CBTS O1) hardware installation flow.
Chapter 1 - Installation Preparation CBTS O1 Installation Precautions Take following precautions during CBTS O1 installation. Avoid hot swap during board installation. Never install antenna feeder system in case of lightning. Check that lightening arresters are in proper contact. Replace damaged arresters immediately. Wear antistatic wrist strap during installation. Only qualified person should do installation. Follow specific manual provided by ZTE for installation.
ZXC10 CBTS O1 Hardware Installation Manual Power Supply Requirements Table 6 and Table 7 illustrate ZXC10 CBTS O1 power supply and power consumption requirements respectively. TABLE 6 - POWER SUPPLY INDICES Indices Name Index Requirements Power range DC power supply system -48 V power supply in range of -43.2 V ~ -56.
Chapter 1 - Installation Preparation Electromagnetic Radiation Protection Ensure following Electromagnetic Radiation Protection Requirements. Table 8 shows electromagnetic radiation protection requirements. TABLE 8 - RADIATION PROTECTION REQUIREMENTS Item Requirements Public exposure In 24 hours of a day, average value of electromagnetic power density (in six consecutive minutes) < 0.
ZXC10 CBTS O1 Hardware Installation Manual Tool and Meter List for Installation Table 9 shows tools and meters list required during installation.
Chapter 1 - Installation Preparation Category Name One hacksaw (with several saw blades) One pair of sharp-nose pliers (8”) One pair of diagonal pliers (8”) One pair of slip joint pliers (8") One pair of vices (8”) One needle file set (medium sized) Small tools Tweezers One paintbrush One pair of scissors One hot blower One solder sucker One pair of hydraulic pliers Crowbar Pulley block Auxiliary tools Rope Ladder Forklift Spectrum analyzer SITE MASTER BS tester Meter Qualcomm test MS Compass Multim
ZXC10 CBTS O1 Hardware Installation Manual Technical Documentation Preparation Project Commissioning Documents Prepare following technical documents for equipment commissioning Project Survey Report Engineering staff should prepare a Project Survey Report during onsite survey. Engineering design documents Engineering design documents should be completed by designing unit that the subscriber entrusts. Its replication copy should be provided to the equipment provider before equipment delivery.
Chapter 2 Unpacking and Handover This chapter describes: Checking equipment list Unpacking wooden case Wooden case structure Unpacking procedure Checking cabinet Unpacking carton Carton structure Unpacking procedure Unpacking precautions Checking boards Acceptance and handover Confidential and Proprietary Information of ZTE CORPORATION 23
ZXC10 CBTS O1 Hardware Installation Manual Checking Equipment List Count goods during unpacking and note following points: Check Delivery Checklist of ZTE CORPORATION. Check total number of goods, intactness of packing boxes, and check whether arrival place is actual installation place against packing list number attached to packing boxes. If goods are intact, start to unpack and inspect them. Contact ZTE headquarters, if any item is damaged or missing during unpacking inspection process.
Chapter 2 - Unpacking and Handover Unpacking Wooden Box Wooden Box Structure Figure 2 shows CBTS O1 cabinet wooden box structure. FIGURE 2 - WOODEN BOX Unpacking Procedure Take following steps to unpack a wooden box: 1. Arrange appropriate tools such as nail hammer, pliers, straight screwdriver and crowbar. 2. Insert a flat-tip screwdriver into slit between case and front cover board to make it loose. Then insert a crowbar to unclench cover board. 3. Erect wooden case.
ZXC10 CBTS O1 Hardware Installation Manual Checking Cabinet Check cabinet according to packing list and ensure following: There are no dents, bulges, scratches, peels, blithers, blisters or smudges on outer surface of cabinets. Busbars, fans and installation positions on cabinets are free from damage or distortion. Cabinet slots for plug-in frames are intact. Guide rails of plug-in slots are not damaged. Installation slot labels are intact.
Chapter 2 - Unpacking and Handover Unpacking Precautions Take following precautions to unpack carton: Take anti-static measures to avoid equipment damage. To avoid damage to goods, do not cut too deep. Wait for 30 minutes before unpacking equipment, when equipment is moved from a colder and drier place to a hotter and damper place. Properly recycle desiccants.
ZXC10 CBTS O1 Hardware Installation Manual This page is intentionally blank 28 Confidential and Proprietary Information of ZTE CORPORATION
Chapter 3 Cabinet Installation This chapter describes: Cabinet structure Cabinet installation precautions Ground installation mode Ground installation mode flow Confidential and Proprietary Information of ZTE CORPORATION 29
ZXC10 CBTS O1 Hardware Installation Manual Cabinet Structure FIGURE 4 - CABINET OUTER VIEW Figure 4 shows CBTS O1 cabinet outer view. Cabinet dimensions: 900 mm (W) × 780 mm (D) × 1800 mm (H) Cabinet dimensions: 35.43 inch (W) × 30.70 inch (D) × 70.
Chapter 3 - Cabinet Installation Figure 5 shows CBTS O1 cabinet front view. FIGURE 5 - CABINET FRONT VIEW 1. Upper shelf 2. Fan group 1 3. Lower shelf 4. Fan group 2 5. Transmission shelf 6. Power shelf 7. Test port and O_PH 8. Flashlight 9. Battery group Table 10 illustrates CBTS O1 weights with different configurations. TABLE 10 - CABINET WEIGHT System Description Weight (lb) Weight (kg) Cabinet (including a heat exchanger, rack and base) 562.17 255 Imbedded power module 55.
ZXC10 CBTS O1 Hardware Installation Manual Cabinet Installation Precautions Install cabinet according to engineering design specifications. Vertical error should be less than 0.118 inch (0.3 m). Screw all nuts and bolts tightly. Handle equipment carefully. Ground Installation Mode Ground installation modes involve CBTS O1 installation under a tower plat form or on a roof. During installation under a tower plat form build a safety wall around CBTS O1 system.
Chapter 3 - Cabinet Installation Ground Installation Mode Flow Figure 6 illustrates ground installation mode flow chart.
ZXC10 CBTS O1 Hardware Installation Manual Take following steps for CBTS O1 ground installation: 1. Building a concrete platform Build a 47.24 inch x 59.05 inch x 3.39 inch (1200 mm × 1500 mm × 100 mm) concrete platform. Figure 7 shows expansion bolt holes dimensions 29.52 inch x 18.89 inch (750 mm × 480 mm) to install two channel steel bars. FIGURE 7 - SINGLE CABINET CONCRETE PLATFORM (UNITS MM) Figure 8 shows 14b (GB/T707-1998) channel steel cross section.
Chapter 3 - Cabinet Installation 2. Determine positions of four holes for installing channel steel according to engineering design drawing. See Figure 9 for single. FIGURE 9 - DRAWING LINES FOR SINGLE CABINET TOP VIEW (UNITS MM) 0 0 2 1 0 0 5 1 0 8 4 0 5 7 After drawing lines, measure lines once again to verify them. 3. Drilling holes Drill φ14 holes, each 3.54 inch (90 mm) depth at marked positions for ground expansion bolt holes. Keep drill bit vertical while drilling holes with a percussion drill.
ZXC10 CBTS O1 Hardware Installation Manual 5. Fixing channel steel Figure 11 shows to fix channel steel on concrete platform using expansion bolts. FIGURE 11 - FIXING CHANNEL STEEL Figure 12 shows complete installation of channel steel.
Chapter 3 - Cabinet Installation After channel steel installation, check its level with horizontal ruler. Horizontal error should not more than 0.039 inch (1 mm). Figure 13 shows to minimize horizontal error according to ground level using washers. FIGURE 13 - MINIMIZING ERROR WITH WASHER 1. Adjusting Washer 6. Fixing cabinet Move cabinet to installation position and fix it onto channel steel with 4 bolts. Figure 14 shows fixing cabinet. FIGURE 14 - FIXING CABINET 1. Screw 2. Flat washer 3.
ZXC10 CBTS O1 Hardware Installation Manual Figure 15 shows view of single cabinet after installation. FIGURE 15 - SINGLE CABINET INSTALLATION 7. Insulation test Use multimeter to measure resistance between expansion bolts and cabinet. Open circuit indicates proper insulation. If result is otherwise, check insulation again and repeat the test.
Chapter 3 - Cabinet Installation Cabinet Accessories Installation This section describes cabinet accessories installation. Following are cabinet accessories: Heat exchanger Shutter Power subrack Windshield cover board Heat Exchanger Heat exchanger is already installed and is debugged before delivery. Following section describes heat exchanger dismantling and installation during maintenance. 1. Dismante After opening the front door, power off the heat exchanger and unplug all the sockets.
ZXC10 CBTS O1 Hardware Installation Manual 2. Installation Fix heat exchanger on front door with the removed twenty-six screws; make sure to fasten the screws. Shutter Follow procedure below to remove and install shutter during maintenance. 1. Remove After opening front door, remove the six screws inside the front door. Figure 17 shows this process. Take out shutter directly through front door. Heat exchanger is removal is optional. FIGURE 17 - SHUTTER DISMANTLING 1 1. Shutter 2 3 2. Front door 3.
Chapter 3 - Cabinet Installation Power Subrack Power subrack is already installed and is debugged before delivery. Following section describes method for rectifier module installation in subrack during maintenance. Install power subrack with a maximum of four rectifier modules, in 3+1 backup mode and accept hot plugging. 1. Dismantle i. Loosen both side screws on module handle and put handle into OPEN state. ii. Hold handle and take out module, Figure 18 shows this process.
ZXC10 CBTS O1 Hardware Installation Manual i. Insert module into the cabinet along the guide rail. ii. After module is inserted, press handle into right position (so that it touches backplane properly), and fasten screws on both sides of handle. Windshield Cover Board Install windshield cover board after internal cable installation. Put cover board into cabinet according to arrow direction, and fix it onto right position with 5 screws, Figure 20 shows this process.
Chapter 3 - Cabinet Installation Figure 21 Completing Installation shows complete installation. FIGURE 21 COMPLETING INSTALLATION 1. Screw 2.
ZXC10 CBTS O1 Hardware Installation Manual This page is intentionally blank.
Chapter 4 Cable Installation This chapter describes cable installation: Power and grounding cables Power cable installation External cable installation Cable installation requirements Confidential and Proprietary Information of ZTE CORPORATION 45
ZXC10 CBTS O1 Hardware Installation Manual Power and Grounding Cables ZXC10 CBTS O1 power and grounding cables are located at cabinet bottom. Power cable Power cables have cross section area of 16 mm2 and are fed with 220V AC. Live wire is brown and neutral wire is black. PE protection ground cable Ground cable has cross section area of 35 mm² and is yellowish green.
Chapter 4 - Cable Installation Connect power and grounding cables according to engineering design drawing. Figure 22 shows power and grounding cable connections. FIGURE 22 - POWER AND GROUNDING CABLE CONNECTIONS 1. Grounding cable 2. AC power cable 3. AC power filter 4. Lightning arrester 5.
ZXC10 CBTS O1 Hardware Installation Manual External Cable Installation Connect all external cables through interface at cabinet bottom. Following are external cable types: AC_IN power cable Battery power cable E1/T1 cable Optical cable and microwave intermediate frequency cable PE ground cable RF cable GPS Antenna feeder RF cable Figure 23 shows CBTS O1 cabinet bottom interface top view. Ensure that all external connections are waterproof and corrosion resistive.
Chapter 4 - Cable Installation Figure 24 shows cabinet bottom interfaces bottom view FIGURE 24 - CABINET BOTTOM INTERFACE BOTTOM VIEW 1. GPS antenna 2. AC power cable 3. Protection ground 4. Battery positive terminal 5. Battery negative terminal 6. E1/ T1 7. Main feeder cable 8. Ventilation hole 9. Optical fiber For GPS cable installation refer to corresponding chapter.
ZXC10 CBTS O1 Hardware Installation Manual Table 12 shows cable connection relationship TABLE 12 - CABLE CONNECTION RELATIONSHIP S.N.
Chapter 4 - Cable Installation Battery Cables CBTS O1 cabinet has small battery setup due to volume restrictions. Use external battery for uninterrupted power supply in case of main AC failure for longer time. There are two battery terminals marked as BAT+ and BAT- on cabinet for external connection. Optical Cable & Microwave Intermediate Frequency Cable There are four entrance points for optical fiber cable at cabinet bottom marked as FIBER 1, FIBER 2, FIBER 3 and FIBER 4.
ZXC10 CBTS O1 Hardware Installation Manual E1/T1 Cable Abis interface adopts E1/T1 interface. E1/T1 cable connects external transmission device or BSC through Abis interface. There are two types of E1 cables, 75 ohm and 120 ohm impedance cables. Figure 26 shows 75 ohm E1 cable interface with eight ports. Route all external E1 cables through these ports. FIGURE 26 - E1 CABLE INTERFACE T1 T4 R4 R8 T3 R3 R7 T2 T7 R2 R6 R1 R5 T5 T6 T8 Figure 27shows 120 ohm E1 and 100 ohm T1 interface.
Chapter 4 - Cable Installation FIGURE 27 - 120 OHM E1 AND 100 OHM T1 INTERFACE Confidential and Proprietary Information of ZTE CORPORATION 53
ZXC10 CBTS O1 Hardware Installation Manual Cable Installation Requirements Ensure following requirements during cable installation: Install power supply and grounding cables separately. Ensure that distance between cable bundles is at least 7.87 inch (200 mm). Cut cable ties flat after making cable bundles. Measure cable lengths before installation. Avoid cable connections or welding. Figure 28 illustrates this process.
Chapter 4 - Cable Installation Figure 29 shows difference between correct and incorrect bundle. FIGURE 29 - CABLE STRAPS REQUIREMENTS Keep space between each two cable straps up to 3~4 times longer than bundle diameter. Figure 30 shows this process.
Chapter 5 Main Antenna Feeder System Installation This chapter describes main antenna feeder system installation: Main antenna feeder system installation Antenna installation preparation Antenna installation precautions Main antenna feeder system structure Antenna types Super flexible jumper Main feeder cable Grounding kit Lightning arrester Antenna feeder system connectors Antenna installation technical parameters Antenna installation flow chart Selectin
Chapter 5 - Main Antenna Feeder System Installation Main Antenna Feeder System Installation Antenna Installation Preparation Proper antenna installation ensures BSS system reliable operation. Install antenna according to specific network planning engineering design. Install antenna in correct direction, elevation, gain and diversity reception modes including correct tilt and azimuth for each sector. Ensure antennas wind resistance capability maximum up to 150 km/h.
ZXC10 CBTS O1 Hardware Installation Manual Figure 31 shows 3-sector antenna feeder system structure.
Chapter 5 - Main Antenna Feeder System Installation Antennas Types There are two main CBTS O1 antenna types: Uni-directional Omni-directional Figure 32 shows directional antenna on right side and omni-directional antenna on left side. FIGURE 32 - OMNI AND UNI-DIRECTIONAL ANTENNAS Super Flexible Jumper Use super-flexible jumper where a small bending radius is required. Threads on its surface make it highly flexible and able to resist pressure.
ZXC10 CBTS O1 Hardware Installation Manual Main Feeder Cable Use 7/8" feeder cable between antenna jumper and cabinet top jumper. Figure 34 shows main feeder cable, common foam insulating feeder cable consists of internal and external conductors. Internal conductor is wrapped with low-loss foam insulator. Feeder cable is covered with a fire and smoke proof sheath. FIGURE 34 - M AIN FEEDER CABLE Grounding Kit Use grounding kit to protect antenna feeder cables and other devices against lightning.
Chapter 5 - Main Antenna Feeder System Installation Lightning Arrester Use lightning arrester to protect cable against lightning. There are two types of common lightning arresters: λ/4 stub lightning arrester Figure 36 shows λ/4 stubs, it is a tri-port passive coaxial component. Length of each third port is one quarter of wavelength and its external and internal conductors are short-circuited. Its working principle is similar to that of band pass filter.
ZXC10 CBTS O1 Hardware Installation Manual Antenna Feeder System Connectors Figure 38 shows all connectors in antenna feeder system. Following sections describes antenna feeder system connectors. FIGURE 38 - CONNECTORS IN ANTENNA FEEDER SYSTEM DIN series connectors are medium and large power connectors with threads. Use DIN series connectors to connect RF coaxial cables in vibration and adverse environments. Figure 39 shows 1/2" connector on left and 7/8" connector on right side.
Chapter 5 - Main Antenna Feeder System Installation Figure 40 shows 7/16 type series big threaded water proof coaxial connectors, male connector on left and female connector on right side. Use 7/16 type connectors as outdoor connectors for transmitting medium and high energy. FIGURE 40 - 7/16 CONNECTORS Figure 41 shows SMA series threaded connectors with a characteristic impedance of 50 Ω. Male connector is on left and female connector on right side. External conductor inner diameter is 162.
ZXC10 CBTS O1 Hardware Installation Manual Antenna Installation Technical Parameters Height It depends upon network planning. Azimuth It depends upon network planning. Tilt It depends upon network planning and ranges from 0° ~ 10°. Antenna direction It depends upon antenna azimuth. Two antennas in same sector should point to same direction. Spacing between diversity antennas Two antennas in same sector act as diversity receiving antennas for each other, and have same vertical height.
Chapter 5 - Main Antenna Feeder System Installation Antenna Installation Flow Chart Figure 43 shows antenna installation flow chart. FIGURE 43 - ANTENNA INSTALLATION FLOW CHART Selecting Installation Position Select installation position according to engineering design. Incase of failure prepare a secondary engineering design, negotiating with customer and design institute, based on: local coverage requirements, spatial diversity requirements, antenna azimuth and tilt.
ZXC10 CBTS O1 Hardware Installation Manual Figure 44 illustrates hoisting process. FIGURE 44 - HOISTING AN ANTENNA 1. Rope 2. Pulley block 3. Knot rope at both ends of antenna To mount an antenna on roof, move antenna and installation materials to installation position manually. Caution: Personnel on and under the tower should coordinate in hoisting an antenna. Personnel under the tower should pull antenna away from tower body to avoid damage.
Chapter 5 - Main Antenna Feeder System Installation Uni-Directional Antenna Installation This section describes Kathrein antenna installation procedure. Follow installation instructions provided with antenna. Take following steps to install uni-directional antenna: 1. Assembling antenna accessories Directional antenna has a number of installation fasteners. Follow instructions provided along with antenna. For example, Kathrein antenna has two types of fasteners: 738516 and 737974.
ZXC10 CBTS O1 Hardware Installation Manual 2. Fastening antenna onto the pole Fix uni-directional antenna with accessories installed onto antenna pole. Do not tighten screws to facilitate possible azimuth adjustment and tilt. Figure 46 shows antenna fixing supports. FIGURE 46 - ANTENNA FIXING SUPPORT Adjust antennas to appropriate height, Figure 47 shows use U-shaped bolts to fix antenna tilt angle, so that input and output ports of antennas face downwards.
Chapter 5 - Main Antenna Feeder System Installation 3. Adjusting antenna azimuth Take following steps to adjust antenna azimuth. i. Determine antenna azimuth using a compass and installation direction according to engineering design drawing. ii. Turn antenna slightly to adjust direction. At the same time measure antenna direction with a compass to minimize error (generally not more than 5°). iii.
ZXC10 CBTS O1 Hardware Installation Manual 4. Adjusting antenna tilt Take following steps to adjust antenna tilt i. Adjust tilt meter angle required by the engineering design. ii. Turn antenna top slightly and hold antenna from its top. Adjust tilt, till the bead is centered and adjusted tilt meter is next to antenna. Figure 49 shows angle gauge.
Chapter 5 - Main Antenna Feeder System Installation iii. After adjusting tilt, tighten the fastener 737974. Figure 51 shows to adjust antenna tilt. FIGURE 51 - ADJUSTING ANTENNA TILT 1. Antenna pole 2. Kathrein antenna Omni-Directional Antenna Installation Take following steps to install an omni-directional antenna: 1. Adjust antennas to appropriate height. Figure 52 shows to use Ushaped bolts to fix antenna onto the antenna pole. Ensure that antennas input and output ports face downwards.
ZXC10 CBTS O1 Hardware Installation Manual 2. Measure verticality of antenna and ensure that antenna is vertical. 3. Fasten screws with a spanner. Note: To reduce working time at heights and to improve joint connection and waterproof quality. Connect jumper and antenna, and conduct waterproof treatment on the joint before fixing antenna on the pole. Main Feeder Installation Install the main feeder properly to minimize signal loss and for reliable function.
Chapter 5 - Main Antenna Feeder System Installation Antenna Jumpers Installation Antenna jumper is a super-flexible jumper connecting antenna and main feeder cable. Use 1/2" super-flexible jumper for BTS system. Jumper connectors depend on antenna and main feeder cable. Usually, two connectors are male DIN connectors. Following section describes antenna jumper installation: 1.
ZXC10 CBTS O1 Hardware Installation Manual 5. Ensure antenna and feeder cable performance and seal connectors with waterproof self-adhesive tape and PVC tape. While installing 1/2" super-flexible jumper, ensure following: Minimum bending radius of one-time bend is 4.921 inch (125 mm). Figure 56 shows one bend jumper. FIGURE 56 - ONE BEND Minimum bending radius of repeated bend is 7.87 inch (200 mm). Figure 57 shows multiple bend jumpers.
Chapter 5 - Main Antenna Feeder System Installation Take following steps for feeder cable installation: 1. Ensure cable required length and cut off extra cable. 2. Prepare main feeder DIN connector at antenna side. 3. Use a pulley or hoisting trawl to hoist feeder cables to tower. Figure 58 shows hoisting trawl. FIGURE 58 - CABLE HOISTING TRAWL 4. Make main feeder DIN connector at the other side. 5. Use feeder cable clips at every 47.24 inch (1.
ZXC10 CBTS O1 Hardware Installation Manual 6. For floor mounted BTS tower, ensure feeder cable is properly grounded at 19.68 inch ~ 39.37 inch a (500 mm ~ 1000 mm) above the bend where it connects antenna and leaves tower body, and outside the entrance to the equipment room. For feeder cable longer than 2362.20 inch (60 m), ground it in the middle and connect its metallic outer layer to grounding busbar through grounding kit.
Chapter 5 - Main Antenna Feeder System Installation Figure 60 shows lightning arrester side view. FIGURE 60 - LIGHTNING ARRESTER SIDE VIEW 3. Connect lightning arrester grounding pole to main grounding pole or system grounding ring, with a minimum possible grounding resistance. 4. Do not seal connectors before feeder cable performance test. Seal connectors with self-adhesive tape if test result is satisfactory. Figure 61 shows this process.
ZXC10 CBTS O1 Hardware Installation Manual Make sure that grounding port of the lightning arrester is connected to main grounding pole or grounding ring of system to ensure minimum grounding resistance. Install lightning arrester properly. Make sure that working frequency marked on lightning arrester is complies working frequency of BTS system. Grounding Kit Installation Grounding kit serves to connect feeder cable external conductor and tower frame.
Chapter 5 - Main Antenna Feeder System Installation FIGURE 63 - WINDING W ATERPROOF ADHESIVE TAPE 4. Use electrically insulated tapes to wrap entire connecting place. Wind in semi-overlapping mode so that one layer is 0.984 inch higher than previous layer. Figure 64 shows this process. Overlap electrically insulated adhesive taps by half that of previous for each loop. Pull tape to a proper length to avoid folding. Press tape with both hands to make sure that layers are in good contact.
ZXC10 CBTS O1 Hardware Installation Manual Cabinet Jumper Installation Connect cabinet and main feeder cable by a 1/2" super-flexible feeder cable. Jumper connector depends on cabinet and main feeder cable. Usually both connectors are positive DIN connectors. Connect antenna feeder jumper to one of fixed antenna feeder bases (HYCOM1 ~ HYCOM6) on cabinet bottom. Testing Antenna Feeder System Test antenna feeder to check whether antenna matches feeder cable and works properly.
Chapter 5 - Main Antenna Feeder System Installation Waterproofing Connectors Seal the connectors of each cable after ensuring that antenna feeder system test is complete and result is OK. Use two types of adhesive tapes for sealing: waterproof self-adhesive insulated tape and electrically insulated adhesive tape. First wrap connectors with electrically insulated adhesive tapes and then with waterproof adhesive tapes, and finally with electrically insulated tapes again.
Chapter 6 GPS Antenna Feeder System Installation This chapter describes GPS antenna feeder system installation: GPS antenna feeder system structure Installation position and requirements Installation requirements Lightning protection requirements GPS connector preparation NJ-9 GPS connector GPS connector preparation procedure GPS connector installation check Confidential and Proprietary Information of ZTE CORPORATION 82
Chapter 6 - GPS Antenna Feeder System Installation GPS Antenna Feeder System Structure Figure 65 shows GPS antenna feeder system composition.
ZXC10 CBTS O1 Hardware Installation Manual Installation Position and Requirements There are two types of GPS antenna installation positions: Tower Mounted Figure 66 shows position of a tower mounted GPS antenna.
Chapter 6 - GPS Antenna Feeder System Installation Roof Mounted Figure 67 shows position of a roof mounted GPS antenna. FIGURE 67 - ROOF MOUNTED GPS ANTENNA Caution: Both installation modes require that no obstacles are present in 150° GPS antenna elevation. Installation Requirements Following are GPS antenna installation requirements: GPS antenna installation position should have a broader view to track on maximum satellites.
ZXC10 CBTS O1 Hardware Installation Manual Lightning Protection Requirements Following are lightning protection requirements to install a GPS antenna: Install GPS antenna within 45° lightning protection coverage area of tower. Otherwise, install a special lightning arrester for the GPS antenna. Place GPS antenna away from lightning strikes. If it is tower mounted, install it in a safe place on the roof or in tower lower part. Ensure that pole supporting GPS antenna is grounded.
Chapter 6 - GPS Antenna Feeder System Installation Figure 69 shows NJ-9 GPS connector parts. FIGURE 69 - NJ-9 GPS CONNECTOR P ARTS 1. Shell 2. Tail connector 3. Air proof washer 1 4. Air proof washer 2 5. Air proof washer 3 6. Insulating washer 7. Insulating washer 8. Insulation plate 9. Inner conductor pin Connector Preparation Procedure Take following steps to prepare GPS connector: 1. Stripping GPS cable shell Use sharp knife to strip GPS cable outer covers about 0.41 inch ± 0.009 inch (10.
ZXC10 CBTS O1 Hardware Installation Manual 2. Installing connector outer parts Assemble all NJ-9 outer parts from left to right on cable. Figure 71 shows external conductor assembly. FIGURE 71 - EXTERNAL CONDUCTOR ASSEMBLY Stretch copper wires back at one end to metal washer. Figure 72 shows white shielded layer after stretching copper wires. FIGURE 72 - SHIELDED LAYER Put sliver coated flange between shielded layer and insulation layer. Finally adjust shielded layer between flange and metal washer.
Chapter 6 - GPS Antenna Feeder System Installation 3. Stripping insulation layer Strip insulation layer so that copper core appears. Avoid damaging copper core and cut insulation layer at equal lengths. Keep outer copper core length between 0.27 inch to 0.287 inch (7 mm to 7.3 mm). Figure 74 shows stripping insulation layer. FIGURE 74 - STRIPPING INSULATION L AYER 7.0 mm ~ 7.3 mm Figure 75 shows cable after stripping insulation layer.
ZXC10 CBTS O1 Hardware Installation Manual 4. Welding inner conductor pin Insert white insulation plate till it touches flange tightly. Figure 76 shows insulation plate insertion. FIGURE 76 - INSERTING INSULATING PLATE Melt a very thin layer of tin (Sn) and cover copper core homogeneously. For fixed temperature iron, adjust temperature to 350 degree Celsius and keep it for 10 seconds. For normal iron add more time till tin is melted properly. Insert copper core into pin tail hole.
Chapter 6 - GPS Antenna Feeder System Installation 5. Cutting Shielded layer Use plier to cut copper wires on shielded layer. Figure 78 shows this process. FIGURE 78 - CUTTING SHIELDED LAYER Plug pin into white supporting ring and assemble shell and cable. Figure 79 shows this process.
ZXC10 CBTS O1 Hardware Installation Manual 6. Shell tightening Put a piece of cloth between wrench and shell, use wrench to tighten shell and tail connecting parts. Figure 80 shows this process. Ensure that torque lies in the range of 98 Nm to 120 Nm and pin is at one level inside the cable. FIGURE 80 - SHELL TIGHTENING GPS Connector Installation Check After GPS cable installation check following: 92 Pin should be at same level inside the shell. Connector strength must be more than 60 N.
Chapter 6 - GPS Antenna Feeder System Installation This page is intentionally blank.
Chapter 7 Board Installation This chapter describes CBTS O1 board installation: Installation flow chart Installation procedure and precautions Installation precautions CBTS O1 board slot RFS board installation BDS boards installation Confidential and Proprietary Information of ZTE CORPORATION 94
Chapter 7 - Board Installation Installation Flow Chart Figure 81 shows board installation flow chart.
ZXC10 CBTS O1 Hardware Installation Manual Installation Procedure and Precautions This section describes board installation in different plug-in boxes. Caution: Ensure power is switched off before board installation. Only TRX and RFE are hot pluggable. Installation Precautions Take following precautions while board installation: Ensure anti-static wrist strap is grounded before operation. Ensure that slots for installing boards are consistent with required slots.
Chapter 7 - Board Installation RFS Board Installation Take following steps to install RFS boards: 1. Wear anti-static wrist straps. 2. Take boards out of anti-static bags and check damaged parts. 3. Select slot position for board installation. 4. Gently insert board vertically along the guide slot. 5. Lock board by pressing down ejector lever. BDS Board Installation Take following steps to install BDS board: 1. Preparations Before installation, take board out of antistatic bag and check them.
ZXC10 CBTS O1 Hardware Installation Manual Push board forward and turn down extraction tool ejector levers on both sides. A click indicates that extraction tool is in the position and its ejector levers are hooked. Figure 84 shows this process. FIGURE 84 - BOARD PLUGGING (STEP 1) 3. Tightening screws Tighten captive screws on extraction tools with flathead or Philips screwdrivers. Figure 85 shows this process.
Chapter 7 - Board Installation This page is intentionally blank.
Chapter 8 Hardware Installation Check This chapter describes CBTS O1 hardware installation check: Cabinet installation check Cabling rack installation check Cable installation check Power and grounding cables Trunk and RF cables Board and sensor installation check Antenna and GPS feeder system installation check 1/2” indoor jumper Lightning arrester Primary and GPS feeder Three-way feeder clamp 1/2” outdoor jumper Antenna Feeder SWR Environment ch
Chapter 8 - Hardware Installation Check Cabinet Installation Check Check following after CBTS O1 cabinet installation. Ensure that cabinet installation location complies with the engineering design drawing. Erect cabinet firmly that must resist an earthquake measuring up to 7.0 on Richter scale. Ensure that horizontal and verticality error and the gap between adjacent bases is less than 3 mm. Ensure all other equipment and cabinet front door are in one line.
ZXC10 CBTS O1 Hardware Installation Manual Cable Installation Check Check following CBTS O1 cables after installation. Power and Grounding Cables Check for following after laying power and grounding cables: 102 Ensure that the equipment room power and grounding cables are in accordance with engineering design specifications. PGND protective grounding wire on a CBTS O1 cabinet employs 35 mm2 yellowish green or yellow copper-core cable connected with indoor PGND grounding copper bars.
Chapter 8 - Hardware Installation Check Trunk and RF Cables Ensure that: Trunk cable connectors are properly installed, labelled and are not loose. Trunk cables have some margin for expansion. Cable connector shell is properly connected with grounding system. RF cables between modules in cabinet are properly connected. Unused connectors are screwed on with a matching terminal. RF cables between TRX, DPA and RFE are in parallel and ensure some margin at bends.
ZXC10 CBTS O1 Hardware Installation Manual Antenna and GPS Feeder System Installation Check Ensure that antenna and GPS feeder system are installed according to engineering design specifications. Check for following after antenna and GPS feeder system installation: 1/2” Indoor Jumper Indoor jumper is properly connected to terminal on cabinet top. Indoor jumpers are tidy, in appropriate length and bound on cabling rack in order. Jumpers are laid in layers according to sectors. 11.
Chapter 8 - Hardware Installation Check Outer grounding copper busbar employs a special reliable path to an underground ground grid. The line width is more than 50 mm2. For a building without a tower, antenna feeder ground at top is connected with nearby lightning protection ground grid on the roof. Feeder grounding cable is led from top to bottom. Separation angle between feeder and grounding cable is no more than 15º. Feeder cabling has no crisscrossing.
ZXC10 CBTS O1 Hardware Installation Manual Antenna Antenna support and tower are properly installed. Antenna model is according to networking planning design. Actual hanging height of an antenna is according to network planning design. RF and GPS antennas are included in the protection area of a lightning arrester (area within 450 down tilt from lightning arrester). Azimuth of antenna is according to network planning. Azimuth error of directional antenna is no more than 50.
Chapter 8 - Hardware Installation Check Environment Check Ensure that: Outdoor engineering wastes are cleaned after the installation is over. Front and rear doors and cabinet sides are cleaned. Clean all fingerprint and other stains on cabinet surface. Indoor unused materials are put away. Material in equipment room is kept in order. Everything indoor is clean and tidy. Any engineering waste materials are disposed off. Leave no cable clips or sundries at the installation site.
Chapter 9 Power On and Off Mechanism This chapter describes: Power supply inspection Precautions Power-on procedure Power-off procedure Confidential and Proprietary Information of ZTE CORPORATION 108
Chapter 9 - Power On and Off Mechanism Power Supply Inspection Ensure following before powering on CBTS O1: 1. All boards are installed according to corresponding slot numbers and configurations. 2. All boards are properly inserted into slots. 3. Cables between same and different racks (including cables on cabinet backplane) are connected correctly. 4. Cables between CBTS O1 and BSC are connected correctly. 5. Input power supply is according to required values of 220 V.
ZXC10 CBTS O1 Hardware Installation Manual Caution : If anything goes wrong in any of above steps shut down power supply immediately, find fault and repeat the step again. Do not power on cabinet until fault is removed. Power-off Procedure CBTS O1 power-off procedure is reverse of power-on procedure.
Chapter 9 - Power On and Off Mechanism This page is intentionally blank.
Appendix A Packing, Storage and Transportation This appendix describes: Packaging Cabinet packing Cabinet packing procedure Board packing Board packing procedure Base packing Engineering material packing Transportation Storage Confidential and Proprietary Information of ZTE CORPORATION 112
Appendix A - Packing, Storage and Transportation Packaging Following sections describes packing cabinet parts in a wooden box. Cabinet packing Figure 86 shows wooden box dimensions to pack cabinet. FIGURE 86 - WOODEN P ACKING BOX FOR CABINET Pack RFE board in a paper packing box made for RFE boards. Pack TRX and DPA boards in a universal paper packing box. Pack power board in a universal paper packing box for parts.
ZXC10 CBTS O1 Hardware Installation Manual Figure 87 shows wooden box used for packing parts. Pack engineering accessories in a universal external paper packing box and put them in a wooden packing. FIGURE 87 - WOODEN P ACKING BOX FOR P ARTS Cabinet Packing Procedure Follow procedure below to pack a cabinet: 1. Blow away dirt from cabinet and clean it with ethyl alcohol. 2.
Appendix A - Packing, Storage and Transportation 7. Put cushions around cabinet and put cabinet into a wooden packing box for cabinets, Figure 88 shows this process. FIGURE 88 - CABINET P ACKING 8. Seal a wooden packing box for cabinets. Put cushions around rack, cover the box and drive nails into wooden case. Figure 89 shows sealing a box.
ZXC10 CBTS O1 Hardware Installation Manual Board Packing Before packing CBTS O1 cabinet, ensure to dismount heavy boards such as RFE-RFE, RFE-DIV, DPA and TRX from the cabinet, which are packed separately. Board packing procedure RFE, TRX and DPA Packing Figure 90 shows that these boards are packed inside a packing foam box first and then put in the packing boxes. FIGURE 90 - INNER P ACKING FOAM BOX Board packing procedure is as follows: i. Clean the board panels with alcohol. ii.
Appendix A - Packing, Storage and Transportation FIGURE 91 - GENERAL P APER P ACKING BOX FOR BOARDS iv. Put RFE board into a foam box and then into a paper packing box. Figure 92 shows this box.
ZXC10 CBTS O1 Hardware Installation Manual Figure 93 shows procedure for board packing. FIGURE 93 - PACKING RFE, DP A AND TRX BOARD 1. Board 2. Inner packing foam box cover 3. Inner packing foam box bottom 4. Closed foam box 5. Paper packing box v. Put packing list into a paper packing box and some packets of desiccant.
Appendix A - Packing, Storage and Transportation vi. Seal the box top with a tape according to H shape. Figure 94 shows to put straps around the paper box at 3.39 inch (10 cm) away from the end. FIGURE 94 - SEALING AND PACKING Base Packing CBTS O1 cabinet base is packed in a paper packing box for base. Pack 8 M10 x 80 expansion bolts and washers in a small plastic bag and put into a paper packing box for bases. After packing, put the paper packing box for bases into a general wooden packing box for parts.
ZXC10 CBTS O1 Hardware Installation Manual Transportation Take following measure for equipment transportation: Products are in a specified container and according to container transportation marks. There are no more than 3 layers for wooden packing box and 4 layers for paper packing box. Sophisticated equipment is placed above and others below. Centre of gravity height is no more than 78.74 inch (20 m), and vehicle is not overloaded.
Appendix A - Packing, Storage and Transportation Check stock conditions regularly. Update inventory record once a month. Install antistatic floorboards at warehouse entrance. Place material in warehouses based on “First-in-first-out” principle. Check equipment conditions by performing tests, if the product is stored for more than six months.
ZXC10 CBTS O1 Hardware Installation Manual Appendix B SiteMaster Usage This appendix describes SiteMaster usage: Frequency range selection SiteMaster check Feeder input parameters Tester installation Measuring SWR Measuring DTF Note: SiteMaster usage depends on model type used. Refer to device usage documents attached for usage.
Appendix B - SiteMaster Usage Frequency Range Selection Take following steps to select a frequency range using SiteMaster: 1. Press to turn on SiteMaster meter. 2. Press on the main menu. 3. Press on the [Frequency] menu. 4. Input [Lower] frequency, such as 825 MHz, and press for confirmation. 5. Press on the [Frequency] menu. 6. Input [Higher] frequency, such as 880 MHz, and press for confirmation. 7. After confirmation, press [Main] to return to the main menu.
ZXC10 CBTS O1 Hardware Installation Manual Tester Installation Connect extension cables one end to RFE jumper connector inside the cabinet and other end to Refl meter interface. If active devices such as tower top amplifier or trunk amplifier are used for feeder measurement, use jumpers to dodge it. Measuring SWR Take following steps to measure SWR: 1. Press 2. Press and select [MODE] 3. Press or to choose and press for confirmation. 4.
Appendix B - SiteMaster Usage Measuring DTF Take following steps to measure DTF: 1. Press 2. Press and select {MODE} 3. Press or to choose [SWR] and press for confirmation. 4. Press to return to the main menu. 5. Input a proper frequency range if required. 6. Check meter if required. 7. Input a proper feeder length if required. 8. Press to return to the main menu. 9. Press to take measurement. 10. Press to adjust screen Y-coordinates. 11.
Acronyms Abbreviation Full Name 1x EV 1x Evolution 1x EV - DO 1x Evolution Data Only 1x EV - DV 1x Evolution Data & Voice 2C3S Two carriers and three sectors 4C3S Four carriers and three sectors A A Interface - Interface between BSC and MSC AAA Authentication, Authorization and Accounting Abis Abis Interface - Interface between BSC and BTS ATM Asynchronous Transfer Mode BDS Baseband Digital System BIM BDS Interface Module BSC Base Station Controller BSS Base Station System BTS B
ZXC10 CBTS O1 Hardware Installation Manual 128 Abbreviation Full Name HLR Home Location Register DPA High Power Amplifier IP Internet Protocol LNA Low Noise Amplifier MAC Media Access Control MBTS Master BTS MSC Mobile Switching Center MTBCF Mean Time Between Critical Failure MTBF Mean Time Between Failure MTTR Mean Time To Recovery O&M Operations and Maintenance OMC Operation and Maintenance Center OSS Operating System Subsystem OTD Orthogonal Transmit Diversity OW Order Wi
Figures Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure 1 - Hardware Installation Flow ............................................................16 2 - Wooden Box .....................................
ZXC10 CBTS O1 Hardware Installation Manual Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure 130 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 - Omni-Dir
Tables Table Table Table Table Table Table Table Table Table Table Table Table Table 1 - Typographical Conventions..............................................................xi 2 - Mouse Operation Conventions......................................................... xii 3 - Safety Signs ............................................................................... xiii 4 - Installation Location Specifications ..................................................17 5 - Temperature and Humidity Range ........
ZXC10 CBTS O1 Hardware Installation Manual This page is intentionally blank 132 Confidential and Proprietary Information of ZTE CORPORATION
Index 4C3S .......................................125 AAA .........................................125 ABIS ........................................ 50 AC 18, 46, 47, 48, 49, 50, 51, 101, 108 ANT ...........................................50 ATM .........................................125 B 46, 50, 121 BDS ..............................93, 96, 125 BIM .........................................125 BS 19, 21 BSC ............ 19, 22, 50, 52, 108, 125 BSS ................................... 56, 125 BTS .......
ZXC10 CBTS O1 Hardware Installation Manual SHORT...................................... 122 SITE ................................... 21, 79 SMA ...........................................62 SNM .........................................126 STS .........................................126 SWR ........ 99, 103, 105, 121, 123, 124 TOD .........................................126 134 Confidential and Proprietary Information of ZTE CORPORATION TRX ............... 95, 102, 112, 115, 117 TX 50, 79, 126 URL .....