EXERT BEELZEBUB Outdoor LIMIT Micro Base Station Engineering installation Guide a Installing the Optical Fiber 24 Installing Antenna Feeder Cables 25 Installing the Monitoring Cable 26 C content Ee Installing the GPS Cable 27 Installing the Ethernet Cable 28 " Waterproof Handling eases mms 30 o Safety Information 3 Concentration Installation (Optional) 32 8 Safety Symbols 3 Installing the Waterproof Cover 33 : [stagnation Precautions 4 Installation Check 35 : Space Requirement «x= 4 Equipment Power-On 36 ;
DRESDEN BS8922 Outdoor UNIS Micro Base Station Engineering Installation Guide a installation Precautions Safety Information The following describes personal health and safety information when you work with ZTE system products. To prevent accidents, read the safety information provided in this document carefully before using ZTE system products. 1 Never open the hermetic seal before or after the installation.
The information provided in this section is used for reference when it is necessary to hoist the RRU. Safety hazmat Life belt Holst the BRU Fixed pull Hui sting ro Hauling cable 7 instanter A on the tower secures the fixed pulley on the tower, and passes the hoisting rope down to the ground through the fixed pulley. Handle Hoisting rope 2 Installer C on the ground bundles the RRU tightly with a cross tie and passes the rope through the handle.
o [ey claw hammer snap=off knife safety glove safety helmet tape measure level ruler pulley [Safety harness| marker pen [percussion drill immediacy : Cross Flathead open-end adjustable : power strip | screwdriver 2 iS pliers : frp sis pl functionalism hydraulic coaxial cable diagonal pliers | slip joint pliers press pliers crisper Stripper : Ethernet cable hacksaw file ping wrench scissors [crystal-connector) cable tie ct imper { BR aon grounding ) rent ne network tester resistance multi meter | SWERVE test
DRESDEN BS8922 Outdoor UNIS Micro Base Station Engineering Installation Guide a Caution: In case of goods shortage, over plus, damage, in arrears, or wrong distribution, installation personnel must stop unpacking immediately, fill in the Unpacking Acceptance Feedback Table, and contact the local ZTE office immediately for proper handling.
DRESDEN BS8922 Outdoor UNIS Micro Base Station Engineering Installation Guide a 5 Adjust the horizontal angle of the ZXSDR BS8922. a Adjust the horizontal angle of the ZXSDR BS8922. 3 Mount the ZXSDR BS8822, on which the installation bracket is installed, on the fixing clip. b Secure the two screws of the Ez BS8922 Installed installation bracket on the on a Pole. fixing clip. 4 Adjust the vertical angle of the ZXSDR BS8922.
DRESDEN BS8922 Outdoor UNIS Micro Base Station Engineering Installation Guide a Opera Tool b Use a 212 percussion drill to drill holes at the marked positions on the Mask wall, and use a vacuum cleaner to remove the dust. Tape {_ Use a claw hammer to knock the expansion bolts into the holes, and Long tape fasten the nuts clockwise to make the bolts fully expand in the wall. Marking pen ad . . Level ruler Loosen the nuts counterclockwise, and remove the nuts, spring Fix screws.
FLEXED BUZZER Outdoor MUST Mich Base Alison Engineering Installation Guide a 4 Mount the ZXS5DR B5BO22 on which the installation bracket is installed, on the fixing clip. As we b Secure the two screws of the / ZXSDR BS8922 Installed on installation bracket on the the Wall. fixing clip. 5 Adjust the vertical angle of the ZXSDR B58922. & Loosen the vertical fastening screws until the ZXSDR BS8922 can be adjusted vertically. b Adjust the vertical angle uses EMAIL LOBOTOMIZE-00 00s BT.
Zz Mount the GPS antenna onto the GPS antenna mounting 7 Remove the two MBx20 screws from the GPS antenna mounting part. 3 Mount the GPS antenna assembly onto the ZXSDR BS8922 with two M6x16 screws. i Cable List tem Lora Obtainment interconnected Equipment OT terminal OT terminal Local grounding terminal of ZXSDR B58922 Connector Type Grounding interconnected Port Cable Grounding bar External View Bare wire DC power supply Terminals need io be fabricated on site.
FLEXED BUZZER Outdoor MUST Mich Base Alison Engineering Installation Guide a & cutey proper length of the grounding cable, and peel off the external sheath at end A to expose the wires. Put a heat-shrinkable tube on end A, and crimp it on a grounding terminal. C Use a hot-air blower to heat the heat-shrinkable tube. ad Use the same method to crimp end B on a grounding terminal.
3 Remove the dust on the copper grounding bus bar, install end B on the copper grounding bus bar, and put anti-rust paint around the grounding screws on the copper grounding bus bar. 4 Paste labels on the two ends of the grounding cable. The grounding cable is installed successfully. Installing the Power Cable installation Tools | Operation [ Tool ] Ruler Tailor cables, Wire stripteaser knife Crimp tubular terminals. Crimping pliers Insulate the shielding layer.
1 Loosen the nut at the end of the power cable sheath counterclockwise. 2 Insert the power plug of the power cable into the power interface of the ZXSDR BS8922. 3 Push the power cable sheath upwards until it fastens onto the slot of the power interface. Z ol 4 Fasten the nut at the end of the power cable sheath clockwise. 5 Connect end B of the power cable to the power supply. 6 caste labels on the two ends of the power cable. The power cable is installed successfully.
4 Fasten the nut at the end of the optical fiber sheath clockwise. 5 Connect end B of the optical fiber to the transmission device at the opposite end. Paste labels at the two ends of the optical fiber. The optical fiber is installed successfully. Installing Antenna Feeder Cables Prerequisite: The ZXSDR BS8922 is connected to an antenna installed in separate-installation mode. installation Tools Liberation Tool Fasten feeder connectors. Cross-head screwdriver/Torgue wrench Waterproof feeder connectors.
Brit No ot End A Signal Name Signal Description Cable Col oral Eel B 1 MON RS485A MONITOR interface RB485 bus Red signal positive 5 MON. RS4858 MONITOR interface RS485 bus Black signal, negative 3 Dry Node Int+| Dry contact input, positive Brown 8 GND Grounding Yellow 4 Dry Echinoderm | Dry contact input, positive Blue 10 GND Grounding White Steps 1 Connect end A of the monitoring cable to the MON interface of the ZXSDR BS8922. 2 connect end B of the monitoring cable to a monitoring device.
FLEXED BUZZER Outdoor MUST Mich Base Alison Engineering Installation Guide Peel the Ethernet cable, and crimp the crystal connector at end A. For a description of the cable connections, refer to Table. 3 Push the Ethernet cable sheath upwards until it fastens onto the slot of the ETH interface. No.
Steps 1 Wrap one layer of insulating tape from bottom to top, see Figure @ . Note Allen a connector is connected wisp insulating pe on the connector in the fastening direction, with the upper layer overlapping ‘2 of the lower layer. The wrapped insulating aoe is 10 mim Longer baying the convection eng Keep enough stretching force when wrapping insulating tape.
DRESDEN BS8922 Outdoor UNIS Micro Base Station Engineering Installation Guide a Steps Inner enclosure Clamp a concentration to the Fasten the two captive screws © Oiidichsiie O ZXSDR BS8922, and fix it on the on the front of the concentration. © Protruding part ZXSDR BS8922 with the screws The concentration is installed of the power on the two sides of it. successfully. interface 3 Cover the inner enclosure with the outer enclosure, until a click sound is heard.
EXERT BEELZEBUB Outdoor LIMIT Micro Base Station Engineering installation Guide a Installation Check Rust and stains on the grounding terminal of the protective grounding i 13 | cable are removed before the cable is connected. After the cable is tem [Nol Requirement Tw Tonya guardsman Grounding The installation components are installed in proper order, and the All cable connectors are wrapped for waterproof purposes. Insulating 1 i and 14 ; ; equipment is fixed securely without swaying.
EXERT BEELZEBUB Outdoor LIMIT Micro Base Station Engineering installation Guide a Power-On Steps: 1 Connect the power supply equipment to the junction box of the ZXSDR BS88922, or switch on the air circuit breaker of the lightning protection box. 2 Observe the indicators to determine whether the ZXSDR BS8922 is powered on successfully. 0 [e101 Before leaving the installation site, make sure that the following jobs are completed: E Put away the tools. Put away the installation tools.