Install Instructions

Zurn Industries, LLC | Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada
| Zurn Industries Limited
7900 Goreway Drive, Unit 10, Brampton, Ontario L6T 5W6, Ph. 877.892.5216
www.zurn.com
Rev. -
Date: 10/8/2019
C.N. No. 142003
Form. No. LC35
WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
ADVERTENCIA: Cáncer y daño reproductivo - www.P65Warnings.ca.gov
AVERTISSEMENT: Cancer et effets néfastes sur la reproduction - www.P65Warnings.ca.gov
FS8 and FS12
FLOOR SINK INSTALLATION INSTRUCTIONS
1. Determine height of the floor sink body to the finished floor. Ensure to account for tile thickness. Cut pipe to
determined height and solvent weld sink body to pipe. Floor sink body can be flush to finish floor (see Figure 1a) or
up to 1 1/4" [32] above the finished floor (see Figure 1b).
Note: If installing trap primer, drill and tap hole at top of recess on sink body before installation.
2. Pour concrete and vibrate around sink body to ensure all voids are removed.
FIGURE 1a FIGURE 1b
1
1
4
[32] MAX
3. Install finished floor, ensuring sink body is sealed to the floor.
Flush with floor
1
1
4
[32] Max above finished floor
No voids

Summary of content (1 pages)