Install Instructions

ZURN LIGHT COMMERCIAL PLUMBING PRODUCTS
2640 South Work Street
Falconer, NY 14733
Phone: 1-800/906-5060
Fax: 716/665-3126
World Wide Web: www.zurn.com
®
Form # JS2 Date: 3/13/09 C.N. No. 99791 Rev. F Page 2 of 2
GT2700
Grease Interceptor Installation & Cleaning Instructions
MAINTENANCE
General Considerations
To obtain optimum operating efficiency of a properly sized and installed PDI certified grease interceptor,
a regular schedule of maintenance
must be adhered to.
Cleaning
All grease interceptors must be cleaned regularly. The frequency of grease removal is dependent upon the
capacity of the interceptor and the quantity of grease in waste water. Check interceptor daily until a grease level
of 2" to 3" has been obtained (cleaning level). When the grease removal interval has been determined for a
specific installation, regular cleaning at that interval is necessary to maintain the rated efficiency of the
interceptor. After the accumulated grease and waste material has been removed, the interceptor should be
thoroughly checked to make certain the inlet, outlet, and air relief ports are clear of obstructions.
Please follow the steps below when cleaning.
1. Remove the center 3/8" Allen bolt lift handle assembly.
2. Remove cover.
3. Clean out remaining grease.
4. Run water into interceptor to flush. Clean out "outlet" chamber by removing cleanout plug and
spraying water down inside.
5. Inspect cover gasket and replace as needed.
6. Replace cover and secure the 3/8" Allen bolt lift handle assembly.