Installation Sheet

ZURN INDUSTRIES, LLC 5900 Elwin Buchanan Drive, Sanford, NC U.S.A. 27330, Ph. 1-800-997-3876, Fax 919-775-3541
In Canada: ZURN INDUSTRIES LIMITED 7900 Goreway Drive, Unit 10, Brampton, Ontario L6T 5W6, Ph. 905-405-8272, Fax 905-405-1292
Rev. H Date: 10/29/2018 C.N. No. SAN008373 Prod. | Dwg. No. CF1024
PAGE 1 OF 4
Operation Installation Maintenance Instructions Replacement Kits
Pressure Balancing Shower/
Tub & Shower Valve
Z7300 Series
TEMP-GARD III
INSTALLATION OF TEMP-GARD III SHOWER VALVE (Refer to page 4 for part no.)
®
WARNING: Caution should be taken
when heating valve for sweat connec-
tions to avoid damaging internal rubber
and plastic components in valve.
1. Install rough piping and valve body as shown.
Do not use PEX or CPVC CTS piping from
valve to tub spout, as the reduced ID re-
sults in too much back pressure for valve
to function properly. When facing valve, HOT
“H” is on left and COLD “C” is on right. Tub
port “T” should face down and shower port “S”
should face upward. The ears on the valve at
the 5 o’clock and 11 o’clock positions may be
used to attach the valve to framing of wall if
necessary.
2.Alwaysinstallvalvewithmudguard(23)sothattheindicatedsurfaceonmudguardisushwithnishedwall.
The hole in the wall should be 4” in diameter.
3.Ifvalveistobeusedforashoweronly,wrapthreadsontubplug(24)withteontapeandinstallplugintotub
port on shower valve.
4.Whenthenalouterwallisnishedremovemudguardandopenbothsupplystopsonvalvebyturningcounter
clockwise.
5. Loosen and remove escutcheon (19) from valve. Carefully remove cartridge (10) from valve by holding car
tridge as close to the valve body (1) as possible and wiggling back and forth until cartridge comes out of the
valve.Placethumbandngerongraypartofcartridgetoremoveit,asshowninFigure4.
6.Withthecartridgesremovedfromallvalvesinthesystem,turnonwatersupplyandushthesystemofany
debris.Ifthewatercomingoutofthevalvewhileushingisgoingbehindnishedwall,ahosebibushing
out kit (RK7300-20HB) may be used to allow the water to be directed to a drain by attaching a garden hose
to valve.
7.Ifhotandcoldsupplyinletsarereversedsimplyremovecartridgeandreinstallwithcartridgeipped
180
o
. The handle adaptor (12) will need to be readjusted. To adjust handle adaptor remove and turn
180
o
. Handle should always turn through cold, then hot. Reinstall cartridge and tighten escutcheon
to150inlbs.Thesystemwillneedtobeushedagainbeforeinstallingshowerheads.
FOR OPTIMUM VALVE
PERFORMANCE, BALANCE SUPPLY
PRESSURES TO LESS THAN 5 PSI
PRESSURE DIFFERENTIAL BETWEEN
HOT AND COLD WATER SUPPLIES.
FIGURE 1
WARNING: Cancer and Reproducve Harm - www.P65Warnings.ca.gov
ADVERTENCIA: Cáncer y daño reproducvo - www.P65Warnings.ca.gov
AVERTISSEMENT: Cancer et eets néfastes sur la reproducon - www.P65Warnings.ca.gov

Summary of content (4 pages)