Installation Guide

AQUASPEC FAUCETS
MODEL - Z83600 SERIES
BUBBLER
TECHNICAL INFORMATION
FLOW: 1.0 GPM @ 80 PSI ADJUSTABLE
MAXIMUM PRESSURE: 125 PSI
MAXIMUM TEMPERATURE: 180
O
F
F
®
INSTALLATION INSTRUCTIONS
1. THE WATER SUPPLY LINE MUST BE THOROUGHLY FLUSHED BEFORE BUBBLER INSTALLATION.
2. REMOVE BUBBLER FROM CARTON AND PLACE GASKET (#11A) ON SHANK.
3. PLACE BUBBLER ON SINK, MOUNT LOCKWASHER (#11B) AND MOUNTING NUT (#11C) ONTO SHANK FROM UNDER
SINK.
4. HAND TIGHTEN MOUNTING NUT (#11C). MAKE SURE BUBBLER IS CENTERED PROPERLY. DO NOT OVER TIGHTEN,
YOU COULD DAMAGE THE FIXTURE.
5. ATTACH LAVATORY SUPPLY TO THE OUTLET OF BUBBLER WITH RISER NUT (#11D).
6. TURN SUPPLY WATER ON AND OPERATE THE BUBBLER WHILE CHECKING FOR LEAKS
PAGE 1 OF 3
IMPORTANTTHE WATER SUPPLY LINES MUST BE THOROUGHLY FLUSHED BEFORE INSTALLATION TO PREVENT
FOREIGN MATTER AND DEBRIS FROM CLOGGING AND/OR DAMAGING INTERNAL COMPONENTS AND THEREBY PREVENTING
THE FAUCET FROM FUNCTIONING PROPERLY
*
IMPORTANTTHE FAUCET HAS AN INTEGRAL SHANK FILTER ASSEMBLY INSTALLED IN THE BODY UNDER THE METERING
CARTRIDGE TO PREVENT FOREIGN MATTER AND DEBRIS FROM DAMAGING THE FAUCET. THE INTEGRAL FILTER MAY BE
REMOVED TO BE BACK-FLUSHED AND CLEANED IF INSUFFICIENT FLOW IS DETECTED. THE INTEGRAL SHANK FILTER
ASSEMBLY MUST BE RE-INSTALLED AFTER SERVICING TO ENSURE PROPER FUNCTIONING OF THE METERING CARTRIDGE.
Form # CF1060 Date: 12/20/11
C.N. No. 128445 Rev. G
ZURN INDUSTRIES, LLC.
COMMERCIAL BRASS OPERATION
5900 ELWIN BUCHANAN DRIVE
SANFORD NC 27330
Phone: 1-800-997-3876
Fax: 919-775-3541
World Wide Web: www.zurn.com
In Canada: ZURN INDUSTRIES LIMITED
3544 Nashua Drive
Mississauga, Ontario L4V1L2
Phone: 905-405-8272 Fax: 905-405-1292

Summary of content (3 pages)