Precision Duct Furnace/Coil to Plenum Transition Kit

TR-FPL

Categories

Description

This Instruction sheet will show you how to install the metal transition between your new Furnace/AC Coil and your existing ductwork supply plenum. The kit is also needed to bridge the gap distance in height as well as plenum length if adding a new AC coil to the supply plenum. Included Items (4) Sheet Metal (each 26” x 14”) (40) Sheet Metal Screws (8) S-Drives (1) 12”Sheet Metal Bender (1) Sheet Metal Screw Bit Tools Needed Flathead Screwdriver Hammer or Rubber Mallet Pliers Sheet Metal Snips Straight Edge Measuring Tape or Ruler IMPORTANT: The furnace and AC coil installation should be completed by a licensed and experienced professional HVAC installer. For safety, ALL venting or gas pipe work must be completed by a trained and experienced installer in this type of work, observing all local codes. Also be sure to wear safety glass and gloves when handling the sharp edges of the sheet metal.

Manuals

#TitleLanguagesPagesUpdated
1InstructionsEN32022-05-01