Triangle Tube Timesaver Primary Secondary Piping Manifold (1.25" NPT) for Challenger Solo Boilers

CCRKIT200

Categories

Description

NOTE: Pump is NOT included. The Timesaver Primary Secondary Piping Manifolds can help you correctly complete the Challenger boiler installation and be out to the next job quicker than ever. The Timesavers come ready to install to the Challenger's connections. Key features include: Accepts most standard pumps such as Taco "00", Grundfos UPS, Wilo Star, etc. Provides 1" NPT boiler connections and 1.25" NPT system connections. Ball valves enable the boiler and / or pump to be isolated from the heating system for maintenance. Integrated fitting for the temperature and pressure gauge supplied with the Challenger.

Manuals

#TitleLanguagesPagesUpdated
1Product OverviewEN22022-03-22